Mark William Carr: Difference between revisions
Jump to navigation
Jump to search
New ‘Railway Person’ page created |
m Link corrected |
||
Line 3: | Line 3: | ||
==Railway Achievements in India== | ==Railway Achievements in India== | ||
*1858, [[Great Southern of India Railway]](GSIR), Chief Engineer <ref name=grace/> | *1858, [[Great Southern of India Railway]](GSIR), Chief Engineer <ref name=grace/> | ||
*c.1863, | *c.1863, resigned from GSIR was appointed Chief Contractor’s Agent for [[Waring Brothers ]], during the construction of the Allahabad and Jubbulpore branch of the [[East Indian Railway]]. | ||
*c.1868, returned to England | *c.1868, returned to England | ||
Latest revision as of 12:51, 24 June 2016
Mark William Carr (1822-1888)[1].
Railway Achievements in India
- 1858, Great Southern of India Railway(GSIR), Chief Engineer [1]
- c.1863, resigned from GSIR was appointed Chief Contractor’s Agent for Waring Brothers , during the construction of the Allahabad and Jubbulpore branch of the East Indian Railway.
- c.1868, returned to England
References
- ↑ 1.0 1.1 Grace's Guide "Mark William Carr" Retrieved on 18 Jun 2016