Hooghly-Katwa Railway: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
Revised information added with references |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
'''Hooghly-Katwa Railway''' | The '''Hooghly-Katwa Railway''' opened in 1913 as a Branch/Link line of the [[East Indian Railway]](EIR)from [[Bandel]] on the [[Hooghly]]-[[Burdwan]](Bardhaman) section of the [[Howrah–Delhi EIR Main Line]]<ref name=wiki>[https://en.wikipedia.org/wiki/Barharwa%E2%80%93Azimganj%E2%80%93Katwa_loop Wikipedia “Barharwa–Azimganj–Katwa loop”)]; Retrieved 11 Nov 2016</ref>. | ||
The line linked to [[Katwa]] where it joined to the [[Barharwa-Azimganj-Katwa Railway]] leading to [[Barharwa]] on the [[Sahibganj Loop EIR Line|Sahibganj Loop]] <ref name=wiki/>. These lines formed part of the EIR network and all were worked by EIR . | |||
==Further Information== | |||
See '''[[East Indian Railway]]''' page | |||
and '''[[East Indian Railway - Lines owned and worked]]''' page | |||
== References == | |||
<references /> | |||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:State Railways]] |
Latest revision as of 11:24, 11 November 2016
The Hooghly-Katwa Railway opened in 1913 as a Branch/Link line of the East Indian Railway(EIR)from Bandel on the Hooghly-Burdwan(Bardhaman) section of the Howrah–Delhi EIR Main Line[1].
The line linked to Katwa where it joined to the Barharwa-Azimganj-Katwa Railway leading to Barharwa on the Sahibganj Loop [1]. These lines formed part of the EIR network and all were worked by EIR .
Further Information
See East Indian Railway page
and East Indian Railway - Lines owned and worked page
References
- ↑ 1.0 1.1 Wikipedia “Barharwa–Azimganj–Katwa loop”); Retrieved 11 Nov 2016