Masulipatam and Hyderabad Light Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
New page all checked
 
PEA-2292 (talk | contribs)
m 'Further Information' added
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
The ''' Masulipatam and Hyderabad Light Railway''' is mentioned in the [[India Office Records]] (IOR) stated below.
The ''' Masulipatam and Hyderabad Tramway/Light Railway proposal'''
There was a proposal in 1854-55 to provide a tramway or light railway between [[Masulipatam]] and [[Hyderabad]]. This would have been a route that would follow the current road number NH65. This is a distance of 115 miles (185km). The construction was not sanctioned.


''No further information has been found.''
It was under consideration at the same time as the [[Cuddalore and Salem Tramway/Light Railway proposal]], which was not sanctioned.


==Records==
See also  [[Early Railway Experiments and Proposals]]  
An on-line search of the [[India Office Records]] (IOR) records held at the [[British Library]] relating to this railway <ref>[http://searcharchives.bl.uk/primo_library/libweb/action/search.do?vid=IAMS_VU2  “British Library Archives and Manuscripts Catalogue”  - Search];  Retrieved  10 Apr 2016</ref>
gives the following: -
*Z/E/4/25/P872; “Public Works, Engineers, Madras, Suggestion of Chief for construction of light railway on roads between Cuddalore and Salem and Masulipatam and Hyderabad; 1854-1855


''This record has not been examined and may provide further information.''
[[Masulipatam]], (named Machilipatnam  today) was founded in the 14th century and it was a major trading port for the British, Dutch and French from the seventeenth century <ref name=machil>[https://en.wikipedia.org/wiki/Machilipatnam  Wikipedia “Machilipatnam” ];  Retrieved  24 Aug 2016</ref>. The port was damaged by a giant ocean wave on 1 November 1864  <ref>[http://www.thehindu.com/news/national/andhra-pradesh/the-rise-and-fall-of-maesolia-port/article7514192.ece The Hindu “The rise and fall of Maesolia Port” 8 Aug 2015];  Retrieved  24 Aug 2016</ref>.
 
==Background==
Colonel [[Arthur Thomas Cotton]]  of the  [[Madras Engineers]] through the [[Government]] of [[Madras Presidency]] at [[Fort St George]]  proposed that a railroad calculated for low speed should be substituted for roads of ordinary construction. <ref> IOR/E/4/825 P720 Public Works, Engineers, Madras, Suggestion of Chief for construction of light railway on roads between Cuddalore and Salem and Masulipatam and Hyderabad</ref>. The road had been built 25yrs before (1829) and had been left in a serious state of disrepair and required almost complete reconstruction. <ref> IOR/E/4/825 P716 </ref> The Directors of the [[East India Company]] apologised for this  <ref> IOR/E/4/825 P727</ref>.
 
[[Masulipatam]] was first settled in the 3rd cent BC (BCE) and the British India company built its first factory (producing and dyeing various cloths), there which meant it grew in to a major trading port<ref name=machil/>. Master in his diary of 1677 describes the port and roads thus “the towne was so well stored with able merchants that many ships loads were procured in a space of one or two days” <ref> “The diaries of Streynsham Master 1675—1680” and other contemporary papers relating there to; edited by Sir Richard Carnac Temple, Bart., Cle. Vol. L The Diary, 1675-1677, published for the Government of India London John Murray, Albemarle Street 1911 p 615</ref>. The lines of communication were very important to sustain the operations and the formation of the road to Hydrabad was of Political and Military importance. The length of road within the Presidency was 115miles (185 km) <ref> IOR/E/4/825 P716</ref>
 
Due to the importance of communication between Masulipatam and the hinterland a canal linking the town and the River Krishna had been built. The Buckingham canal would also terminate at the same point in Vijayawada along with a canal linking with the Godavari River. The Directors were however of the opinion that a railroad on the Hydrabad Road would be of an advantage. <ref> IOR/E/4/825 P724</ref> Much force was given to the comments of Mr Daniel Elliot and Mr Thomas on the advantages and the problems changing modes of transport on the way to the port <ref> IOR/E/4/825 P725</ref>.  They requested that a low speed railway be constructed at a moderate cost, should be tested in such localities that may be most favourable <ref> IOR/E/4/825 P725 </ref>.  The traction to be either light engine or animal power <ref>IOR/E/4/825 P726/7</ref>.  The Madras Government were to select the District and supply the money. Where the experiments were carried out and the result of them is unclear, but the result was that Tramway/Light Railway was not built.
 
[[File: Masulipatam and Hyderabad Light Railway Map.jpg|thumb|Part of “Imperial Gazetteer of India, v. 26, Atlas 1909 edition, Railway Map--Sectional (3), p. 25”]]
In 1835 the government had decided not to increase expenditure on the road, <ref>IOR/E/4/948, p336 "Masulipatam, Road to Hyderabad, Governor General not disposed to sanction further expenditure upon"</ref>. However this proposal unsucessfully attempted to reverse this. Then during the Cyclone of 1864 the port, fort and European village were destroyed and the area around the fort became a vast swamp <ref>"The Imperial Gazetteer of India" Volume 17 Page 215</ref>. The arrival of the meter gauge railway in Hyderabad in 1874 <ref>[https://en.wikipedia.org/wiki/Secunderabad_Junction_railway_station Wikipedia "Secunderabad Junction railway station"];  Retrieved  24 Aug 2016</ref>  meant that it had a better link with the coast at Bombay and it was not commercial viable to use the road to East Coast. The railway finally reached the remaining village in the early 1900’s <ref>[http://dsal.uchicago.edu/reference/gaz_atlas_1909/pager.html?object=31 "Imperial Gazetteer of India" v. 26, Atlas 1909 edition, Railway Map--Sectional (3), p. 25.];  Retrieved  24 Aug 2016</ref> (shown as Dots on the 1909 map) after bridging the innumerable canals that link the two nearby deltas.
 
Where the experiments were carried out and the result of them is unclear, but the result was that Tramway/Light Railway was not built.
 
==Further Information==
See '''[[Early Railway Experiments and Proposals]]''' for more information and background.


==References==
==References==
Line 15: Line 28:
[[Category:Railways]]
[[Category:Railways]]
[[Category:Tramways]]
[[Category:Tramways]]
[[Category:Early Railway Experiments and Proposals]]

Latest revision as of 07:27, 5 January 2017

The Masulipatam and Hyderabad Tramway/Light Railway proposal There was a proposal in 1854-55 to provide a tramway or light railway between Masulipatam and Hyderabad. This would have been a route that would follow the current road number NH65. This is a distance of 115 miles (185km). The construction was not sanctioned.

It was under consideration at the same time as the Cuddalore and Salem Tramway/Light Railway proposal, which was not sanctioned.

See also Early Railway Experiments and Proposals

Masulipatam, (named Machilipatnam today) was founded in the 14th century and it was a major trading port for the British, Dutch and French from the seventeenth century [1]. The port was damaged by a giant ocean wave on 1 November 1864 [2].

Background

Colonel Arthur Thomas Cotton of the Madras Engineers through the Government of Madras Presidency at Fort St George proposed that a railroad calculated for low speed should be substituted for roads of ordinary construction. [3]. The road had been built 25yrs before (1829) and had been left in a serious state of disrepair and required almost complete reconstruction. [4] The Directors of the East India Company apologised for this [5].

Masulipatam was first settled in the 3rd cent BC (BCE) and the British India company built its first factory (producing and dyeing various cloths), there which meant it grew in to a major trading port[1]. Master in his diary of 1677 describes the port and roads thus “the towne was so well stored with able merchants that many ships loads were procured in a space of one or two days” [6]. The lines of communication were very important to sustain the operations and the formation of the road to Hydrabad was of Political and Military importance. The length of road within the Presidency was 115miles (185 km) [7]

Due to the importance of communication between Masulipatam and the hinterland a canal linking the town and the River Krishna had been built. The Buckingham canal would also terminate at the same point in Vijayawada along with a canal linking with the Godavari River. The Directors were however of the opinion that a railroad on the Hydrabad Road would be of an advantage. [8] Much force was given to the comments of Mr Daniel Elliot and Mr Thomas on the advantages and the problems changing modes of transport on the way to the port [9]. They requested that a low speed railway be constructed at a moderate cost, should be tested in such localities that may be most favourable [10]. The traction to be either light engine or animal power [11]. The Madras Government were to select the District and supply the money. Where the experiments were carried out and the result of them is unclear, but the result was that Tramway/Light Railway was not built.

Part of “Imperial Gazetteer of India, v. 26, Atlas 1909 edition, Railway Map--Sectional (3), p. 25”

In 1835 the government had decided not to increase expenditure on the road, [12]. However this proposal unsucessfully attempted to reverse this. Then during the Cyclone of 1864 the port, fort and European village were destroyed and the area around the fort became a vast swamp [13]. The arrival of the meter gauge railway in Hyderabad in 1874 [14] meant that it had a better link with the coast at Bombay and it was not commercial viable to use the road to East Coast. The railway finally reached the remaining village in the early 1900’s [15] (shown as Dots on the 1909 map) after bridging the innumerable canals that link the two nearby deltas.

Where the experiments were carried out and the result of them is unclear, but the result was that Tramway/Light Railway was not built.

Further Information

See Early Railway Experiments and Proposals for more information and background.

References

  1. 1.0 1.1 Wikipedia “Machilipatnam” ; Retrieved 24 Aug 2016
  2. The Hindu “The rise and fall of Maesolia Port” 8 Aug 2015; Retrieved 24 Aug 2016
  3. IOR/E/4/825 P720 Public Works, Engineers, Madras, Suggestion of Chief for construction of light railway on roads between Cuddalore and Salem and Masulipatam and Hyderabad
  4. IOR/E/4/825 P716
  5. IOR/E/4/825 P727
  6. “The diaries of Streynsham Master 1675—1680” and other contemporary papers relating there to; edited by Sir Richard Carnac Temple, Bart., Cle. Vol. L The Diary, 1675-1677, published for the Government of India London John Murray, Albemarle Street 1911 p 615
  7. IOR/E/4/825 P716
  8. IOR/E/4/825 P724
  9. IOR/E/4/825 P725
  10. IOR/E/4/825 P725
  11. IOR/E/4/825 P726/7
  12. IOR/E/4/948, p336 "Masulipatam, Road to Hyderabad, Governor General not disposed to sanction further expenditure upon"
  13. "The Imperial Gazetteer of India" Volume 17 Page 215
  14. Wikipedia "Secunderabad Junction railway station"; Retrieved 24 Aug 2016
  15. "Imperial Gazetteer of India" v. 26, Atlas 1909 edition, Railway Map--Sectional (3), p. 25.; Retrieved 24 Aug 2016