Faridpur Branch Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Redirected page to Eastern Bengal Railway
 
PEA-2292 (talk | contribs)
m →‎Further Information: link changed EBR - Lines owned and worked
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
#REDIRECT [[Eastern Bengal Railway]]
The '''Faridpur Branch Railway''' was a [[Eastern Bengal Railway]](EBR) branch line. The line opened in 1898-99, with a line length of 14 miles(23km) connected to the EBR Eastern Section mainline at Pachooria Junction via Shivarampore to [[Faridpur]]. The broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line opened in 1898-99
<ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n51/mode/1up “Administration Report on Railways 1918” page 42 (pdf51)]; Retrieved 30 Jan 2019</ref>.
 
It was a branch of the [[Poradaha Branch Railway]] that had been constructed by [[Northern Bengal State Railway]](NBSR) but worked by EBR, later apparently taken over by EBR c.1913
 
==Further Infortmation==
See '''[[Eastern Bengal Railway - Lines owned and worked]]'''
 
==References== 


[[Category:Railways]]
[[Category:Railways]]
[[Category:State Railways]]

Latest revision as of 16:44, 4 February 2019

The Faridpur Branch Railway was a Eastern Bengal Railway(EBR) branch line. The line opened in 1898-99, with a line length of 14 miles(23km) connected to the EBR Eastern Section mainline at Pachooria Junction via Shivarampore to Faridpur. The broad gauge(BG) line opened in 1898-99 [1].

It was a branch of the Poradaha Branch Railway that had been constructed by Northern Bengal State Railway(NBSR) but worked by EBR, later apparently taken over by EBR c.1913

Further Infortmation

See Eastern Bengal Railway - Lines owned and worked

References