Faridpur Branch Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Added info with reference
PEA-2292 (talk | contribs)
m →‎Further Information: link changed EBR - Lines owned and worked
 
Line 5: Line 5:


==Further Infortmation==
==Further Infortmation==
See '''[[Eastern Bengal Railway]]'''
See '''[[Eastern Bengal Railway - Lines owned and worked]]'''


==References==   
==References==   

Latest revision as of 16:44, 4 February 2019

The Faridpur Branch Railway was a Eastern Bengal Railway(EBR) branch line. The line opened in 1898-99, with a line length of 14 miles(23km) connected to the EBR Eastern Section mainline at Pachooria Junction via Shivarampore to Faridpur. The broad gauge(BG) line opened in 1898-99 [1].

It was a branch of the Poradaha Branch Railway that had been constructed by Northern Bengal State Railway(NBSR) but worked by EBR, later apparently taken over by EBR c.1913

Further Infortmation

See Eastern Bengal Railway - Lines owned and worked

References