The '''[[Gaekwar's Dabhoi  Railway]]'''(GDR) was the original name of the ox-driven line between [[Dabhoi]] and Miyagam Karjan,  a distance of 20 miles(33km) and opened in 1862. The line was laid during the reign of Sir Khanderao Gaekwar of Baroda, the Maharaja of Baroda. Owned by the [[Princely states|Princely ]][[Baroda State]], it was the first railway built and operated by a Native Prince. <ref name=indian>[https://indianrlynews.wordpress.com/tag/gaekwars-baroda-state-rlys/ "Gaekwar's Baroda State Railway" by Vikas Singh, Editor of Indian Steam Railway Society Magazine]; Retrieved 24 Oct 2016</ref> <ref>[http://www.historyofvadodara.in/gbsr-gaekwars-baroda-state-railways/Gaekwars “History of Vadodara-Baroda / Baroda State Railways” ]; Retrieved 24 Oct 2016</ref>. The network expanded finally becoming the [[Gaekwar's Baroda State Railway]](GBSR) in 1921.
The '''[[Gaekwar's Dabhoi  Railway]]'''(GDR) was the original name of the ox-driven line between [[Dabhoi]] and and [[Miyagam|Mayagam (''some records give this as ‘Mayagam Karjan'']],  a distance of 20 miles(33km) and opened in 1862. The line was laid during the reign of Sir Khanderao Gaekwar of Baroda, the Maharaja of Baroda. Owned by the [[Princely states|Princely ]][[Baroda State]], it was the first railway built and operated by a Native Prince. <ref name=indian>[https://indianrlynews.wordpress.com/tag/gaekwars-baroda-state-rlys/ "Gaekwar's Baroda State Railway" by Vikas Singh, Editor of Indian Steam Railway Society Magazine]; Retrieved 24 Oct 2016</ref> <ref>[http://www.historyofvadodara.in/gbsr-gaekwars-baroda-state-railways/Gaekwars “History of Vadodara-Baroda / Baroda State Railways” ]; Retrieved 24 Oct 2016</ref>. The network expanded finally becoming the [[Gaekwar's Baroda State Railway]](GBSR) in 1921.


<blockquote>''Note''.
<blockquote>''Note''  
*''Some records refer to this railway as the'' '''Dabhoi Railway'''  
*''Some records refer to this railway as the'' '''Dabhoi Railway'''  
*''Some web record, including Wikipedia,  incorrectly name this railway as the '''[[Gaekwar's Baroda State Railway]]'''; which in fact did not come into existence until 1921.''</blockquote>
*''Some web record, including Wikipedia,  incorrectly name this railway as the '''[[Gaekwar's Baroda State Railway]]'''; which in fact did not come into existence until 1921.''</blockquote>


==History==
==History==
[[File: Gaekwar's Dabhoi  Railway Bullock Hauled Train.png|thumb| Gaekwar's Dabhoi  Railway Bullock Hauled Train 1863]]The original line was a 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) with rails weighing 13 lbs to a yard. The line was designed and constructed by A.W.Forde. A pair of oxen used to haul trains composed of 4-6 vehicles. In 1863, Khanderao purchased 3 steam locomotives built by Neilson and Co., Glasgow. These 0-4-0 ST locomotives proved to be too heavy for the rails. During the reign of Malharrao in 1871, the old rails were removed and new rail 30 lbs to a yard were laid <ref>[https://en.wikipedia.org/wiki/Gaekwar%27s_Baroda_State_Railway Wikipedia “Baroda State Railway”]; Retrieved 12 Oct 2016</ref>. The 20mile(32km) ‘Dabhoi-Miyagam’ line was reopened for traffic on 8 April 1878 <ref name=Admin1918>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n44/mode/1up  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 36 and 37]; Retrieved 12 Oct 2016</ref>.
[[File: Gaekwar's Dabhoi  Railway Bullock Hauled Train.png|thumb| Gaekwar's Dabhoi  Railway Bullock Hauled Train 1863]]
The original line was a 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) with rails weighing 13 lbs to a yard. The line was designed and constructed by [[Arthur William Forde]]. A pair of oxen used to haul trains composed of 4-6 vehicles. In 1863, Khanderao purchased 3 steam locomotives built by Neilson and Co., Glasgow. These 0-4-0 ST locomotives proved to be too heavy for the rails. During the reign of Malharrao in 1871, the old rails were removed and new rail 30 lbs to a yard were laid <ref>[https://en.wikipedia.org/wiki/Gaekwar%27s_Baroda_State_Railway Wikipedia “Baroda State Railway”]; Retrieved 12 Oct 2016</ref>. The 20mile(32km) ‘Dabhoi-Miyagam’ line was reopened for traffic on 8 April 1878 <ref name=Admin1918>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n44/mode/1up  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 36 and 37]; Retrieved 12 Oct 2016</ref>. This is shown in Red as “Line A” on the Route Map.


An Agreement was made, effective from 1 Jan 1897, with the [[Bombay, Baroda and Central India Railway]](BB&CIR) for the management, maintenance and working of the ‘Dabhoi Railway’ on behalf of the ‘Government of His Highness the Maharaja Gaekwar of Baroda’ <ref name=Admin1918/>.  It is not known if BB&CIR were responsible prior to this date.  Certainly from this date onwards the BB&CIR were totally responsible for the operation.  
An Agreement was made, effective from 1 Jan 1897, with the [[Bombay, Baroda and Central India Railway]](BB&CIR) for the management, maintenance and working of the ‘Dabhoi Railway’ on behalf of the ‘Government of His Highness the Maharaja Gaekwar of Baroda’ <ref name=Admin1918/>.  It is not known if BB&CIR were responsible prior to this date.  Certainly from this date onwards the BB&CIR were totally responsible for the operation.  
   
   
[[File: Gaekwars Dabhoi Railway Maps.png|thumb| Gaekwars Dabhoi Railway Maps]]
[[Dabhoi]] by 1909 had become an important narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) railway junction as the ‘Gaewar’s Dabhoi Railway’ was expanded; it became the centre where the lines from [[Miyagam]], [[Chandod]] , [[Bodeli]] and [[Baroda]] converge <ref>[http://dsal.uchicago.edu/reference/gazetteer/pager.html?objectid=DS405.1.I34_V11_106.gif  “Imperial Gazetteer of India 1908”, v. 11, p. 100 ]; Retrieved 24 Oct 2015</ref>. These are marked “Lines B” on the map.
 
[[Dabhoi]] by 1909 had become an important narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) railway junction as the Gaewar’s Dabhoi Railway was expanded; it became the centre where the lines from [[Miyagam]], [[Chandod]] , [[Bodeli]] and [[Baroda]] converge <ref>[http://dsal.uchicago.edu/reference/gazetteer/pager.html?objectid=DS405.1.I34_V11_106.gif  “Imperial Gazetteer of India 1908”, v. 11, p. 100 ]; Retrieved 24 Oct 2015</ref>.


A Contract dated 8 April 1907, effective from 1 Jan 1906, between the Secretary of State and the BB&CIR formalised the arrangements for ‘the management, maintenance and working’ of the Dabhoi railway <ref name=Admin1918/>.
A Contract dated 8 April 1907, effective from 1 Jan 1906, between the Secretary of State and the BB&CIR formalised the arrangements for ‘the management, maintenance and working’ of the Dabhoi railway <ref name=Admin1918/>.


Further expansion of the network initiated an Agreement, dated 9 May 1916 between the  ‘Government of His Highness the Maharaja Gaekwar of Baroda’ and the BB&CIR for the ‘management, maintenance and working, by the Company, of the Miyagam-Malsar, Dabhoi-Jarod, Jarod- Samlaya, Samlaya-Timba, Masor Road-Jambusar and the Motipura-Tankhala extensions from the dates they are or shall have been opened for public traffic’ <ref name=Admin1918/>.   
Further expansion of the network initiated an Agreement, dated 9 May 1916 between the  ‘Government of His Highness the Maharaja Gaekwar of Baroda’ and the BB&CIR for the ‘management, maintenance and working, by the Company, of the Miyagam-Malsar (“Line D”), Dabhoi-Jarod-Samlaya (“Line E”), , Masor Road-Jambusar ("Line F”),  Samlaya-Savli-Timba (“Line G”) ... from the dates they are or shall have been opened for public traffic’ <ref name=Admin1918/>.   


With the completion of the ‘Dabhoi-Jarod Line’ in 1919 a total of 187 miles(299km) of Gaekwars Dabhoi Railway was open <ref name=Admin1918/>.   
With the completion of the ‘Dabhoi-Jarod’ Line’ in 1919 a total of 187 miles(299km) of ‘Gaekwars Dabhoi Railway’ was open <ref name=Admin1918/>.   


The GDR  became the narrow gauge([[Rail_gauge#Narrow_Gauge|NG]])  part of the '''[[Gaekwar's Baroda State Railway]]''' (GBSR) on  Oct 1st 1921 as result of the continued expansion or the network into Baroda State. At this time the NG system was 268 miles(429km) in length <ref >[http://www.historyofvadodara.in/railway-museum-auditorium/ “History of Vadodara – Railway Museum /GBSR” ]; Retrieved 12 Oct 2015</ref >.
The GDR  became the narrow gauge([[Rail_gauge#Narrow_Gauge|NG]])  part of the '''[[Gaekwar's Baroda State Railway]]''' (GBSR) on  Oct 1st 1921 as result of the continued expansion or the network into Baroda State. At this time the NG system was 268 miles(429km) in length <ref >[http://www.historyofvadodara.in/railway-museum-auditorium/ “History of Vadodara – Railway Museum /GBSR” ]; Retrieved 12 Oct 2015</ref >.


==Opening of Gaekwar’s Dabhoi Railway lines in chronological order==
[[File:Gaekwar's Dabhoi Railway Routes.png|thumb| Gaekwars Dabhoi Railway marked with Routes up to 1921]]
[[File: Gaekwars Dabhoi Railway Maps.png|thumb| Gaekwars Dabhoi Railway marked up on Google Map]]
 
==Opening of ‘Gaekwar’s Dabhoi Railway’ lines in chronological order==


Information retrieved from “Administration Report on Railways 1918”  <ref name =Admin1918/>  
Information retrieved from “Administration Report on Railways 1918”  <ref name =Admin1918/>  


<blockquote>''Note: Town Names – modern names in (brackets) as seen on Google Maps''
<blockquote>''Note: Town Names – modern names in (brackets) as seen on Google Maps''
  ''Baroda (Vadodora);  Miyagam (Miyaram), Chhota Udaipur (Chhota Udepur)''</blockquote>
  ''[[Baroda]] (Vadodora);  [[Miyagam]] (Miyaram), Chhota Udaipur (Chhota Udepur)''</blockquote>


*’Dabhoi –Miyagam Line’ 20 miles(32km) NG:  1862,  the original Gaekwar's Dabhoi  Railway, driven by oxen; 1873 Apr 4, line re-laid in stronger rails; 1878 Jan 8,  date of reopening, locomotives introduced from about 1878.  
* ‘Dabhoi–Miyagam Line’ (“Red Line A”); 20 miles(32km) NG:  1862,  the original Gaekwar's Dabhoi  Railway, driven by oxen; 1873 Apr 4, line re-laid in stronger rails; 1878 Jan 8,  date of reopening, locomotives introduced from about 1878.  
*’Dabhoi-Chandod Line’ 11 miles(17km) NG: Dabhoi to Chandod, 11 miles(17km), 1879 Apr 15.  
* ‘Dabhoi-Chandod Line’ (“Red Line B”); 11 miles(17km) NG: [[Dabhoi]] to [[Chandod]], 11 miles(17km), 1879 Apr 15.  
*’Dabhoi-Bodeli Line’ 22 miles(35km) NG: Dabhoi to Sankheda Bahadarpur, 10 miles(15km), 1879 Sep 17;  Sankheda Bahadarpur  via Chhuchapura Junction to Bodeli, 12 miles(20km), 1890 Jun 16.
* ‘Dabhoi-Bodeli Line’ (“Line B”); 22 miles(35km) NG: [[Dabhoi]] to Sankheda Bahadarpur, 10 miles(15km), 1879 Sep 17;  Sankheda Bahadarpur  via Chhuchapura Junction to [[Bodeli]], 12 miles(20km), 1890 Jun 16.
*’Dabhoi-Baroda Line’ 19miles(34km) NG:  Dabhoi  to Goya Gate, 17 miles(31km), 1880 Jul 1; Goya Gate  to Baroda (Vishvamitri Station), 2 miles(3km), 1881 Jan 24.  
* ‘Dabhoi-Baroda Line’ (“Red Line B”); 19miles(34km) NG:  Dabhoi  to Goya Gate, 17 miles(31km), 1880 Jul 1; Goya Gate  to [[Baroda]] (Vishvamitri Station), 2 miles(3km), 1881 Jan 24.  
*’Baroda-Masor Road Line’ 20 miles(32km) NG:  Baroda (Vishvamitri Station) to Padra, 7 miles(11km), 1897 Jul 1; Padra to Mobha, 6 miles(10km), 1903 Jul 10; Mobha to Masor Road, 7 miles(11km), 1904 Nov 1.
* ‘Baroda-Masor Road Line’ (“Red Line C”); 20 miles(32km) NG:  Baroda (Vishvamitri Station) to Padra, 7 miles(11km), 1897 Jul 1; Padra to Mobha, 6 miles(10km), 1903 Jul 10; Mobha to Masor Road, 7 miles(11km), 1904 Nov 1.
*’Miyaram Karjan-Malsar Extension’ to the ‘Dabhoi-Miyaram Line’ giving total 44 miles(56km)  Miyaram via Chorada Junction to Malsar, 24 miles(44km), 1912 Jan 15
* ‘Miyagam Karjan-Malsar Line’ (“Red Line D”); 24 miles(44km) NG: extension to the ‘Dabhoi-Miyaram Line’, first proposed in 1906 as the ‘GDR ‘ Miyagam-Sinor Branch’<ref name=Hist1906/>, and later extended  giving total 44 miles(56km)  from [[Miyagam]] via Choranda Junction and Sinor to Malsar, 1912 Jan 15
*’Dabhoi-Timba Line’ 62 miles(100km) NG:  Daboi to Jarod, 24 miles(38km), 1913 Nov 15; Jarod to Samlaya Junction, 5 miles(9km), 1915 Dec 13; Samlaya via Savli to Timba, 33 miles(53km) 1919 Feb 1
* ‘Dabhoi-Timba Line’ (“Red Line E”) 62 miles(100km) NG:  Daboi to Jarod, 24 miles(38km), 1913 Nov 15; Jarod to Samlaya Junction, 5 miles(9km), 1915 Dec 13; Samlaya via Savli to Timba, 33 miles(53km) 1919 Feb 1
*’Baroda-Jambusar Line’ an extension of the ‘Baroda-Masor Road Line’ giving  total  26 miles(43km) NG: Masor Road to Jambusar, 7 miles(11km), 1917 May 1.
* ‘Masor Road-Jambusar Line’ (“Red Line F”); 7 miles(11km) NG: an extension of the ‘Baroda-Masor Road Line’ reaching [[Jambusar]], 1917 May 1.


==Lines Worked as an extension to Gaekwar’s Dabhoi Railway(GDR)==
==Lines Worked as an extension to Gaekwar’s Dabhoi Railway(GDR)==
*[[Bodeli-Chhota Udaipur Railway]] 22.5 miles(36km) NG was sanctioned in 1915 and constructed by the BB&CIR on behalf of the; Baroda and Chota Udaipur Durbars. Opened in 1917 Dec 1, connected to the GDR ‘Daboi-Bodeli Line’ at Chhuchapura Junction and worked by BB&CIR <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n43/mode/1up  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 35]; Retrieved 24 Oct 2016</ref>. The progress had been restricted by “the large contribution arising from lack of funds caused by the large contribution, both direct and indirect, which the Native States had made to the Imperial resources for the conduct of the war” <ref name=Hist1906>[https://archive.org/stream/RailwayProjects/Railway%20projects#page/n0/mode/2up Histories of (Indian)Railway Projects ...up to June 1906  “Railways in India – GOI Administrative Report 1916-17 / Native States Lines” page 17 and 18]; Retrieved 24 Oct 2016</ref>.   
* [[Bodeli-Chhota Udaipur Railway]]’ (“Green Line H”) 22.5 miles(36km) NG was sanctioned in 1915 and constructed by the BB&CIR on behalf of the; Baroda and Chota Udaipur Durbars. Opened in 1917 Dec 1, connected to the GDR ‘Daboi-Bodeli Line’ at Chhuchapura Junction and worked by BB&CIR <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n43/mode/1up  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 35]; Retrieved 24 Oct 2016</ref>. The progress had been restricted by “the large contribution arising from lack of funds caused by the large contribution, both direct and indirect, which the Native States had made to the Imperial resources for the conduct of the war” <ref name=Hist1906>[https://archive.org/stream/RailwayProjects/Railway%20projects#page/n0/mode/2up Histories of (Indian)Railway Projects ...up to June 1906  “Railways in India – GOI Administrative Report 1916-17 / Native States Lines” page 17 and 18]; Retrieved 24 Oct 2016</ref>.   


==Proposals and Surveys on behalf of the GDR==  
==Proposals and Surveys on behalf of the GDR==  
A number of projects were considered, some were abandoned and, several were postponed on account of WW1. The progress had been restricted by “the large contribution arising from lack of funds caused by the large contribution, both direct and indirect, which the Native States had made to the Imperial resources for the conduct of the war” <ref name=Hist1906/>. Some were finally completed after 1921 by GBSR.
A number of projects were considered, some were abandoned and, several were postponed on account of WW1. The progress had been restricted by “the large contribution arising from lack of funds caused by the large contribution, both direct and indirect, which the Native States had made to the Imperial resources for the conduct of the war” <ref name=Hist1906/>. Some were finally completed after 1921 by GBSR.


*‘Broach-Jambusar-Masor Road(Kangat) Branch’, 31 miles (50km) NG:  proposed 1903 then  abandoned 
* ‘Broach-Jambusar-Masor Road(Kangat) Branch’, 31 miles (50km) NG:  proposed 1903 <ref name=Hist1906/>  The GDR  ‘Masor Road-Jambusar Section’ was finally opened in 1917. The ‘[[Broach-Jambusar Railway]]’ was constructed by the BB&CIR and opened in Nov 1914. 1914 as a branch of the [[Bombay, Baroda and Central India Railway]](BB&CIR) <ref name=Admin1918p35>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n44/mode/1up “Administration Report on Railways 1918” page35 (pdf44) ]; Retrieved 13 Feb 2018</ref>
<ref name=Hist1906/>  The GDR  ‘Jambusar-Masor Road was finally opened in 1917. Broach was not connected to Jambusar until after the GBSR took over in 1921.   
* [[Kosamba-Zankhvav Railway|'Kosamba-Zankavao Section’]], 26 miles(42km) NG, surveyed in 1900 <ref name=Hist1906/>. Not constructed until after 1921 by the GBSR as part of the ‘Kosamba- Zankavao-Umarpada Line’.  
* ‘Kosamba- Zankavao Section’, 26 miles(42km) NG, surveyed in 1900 <ref name=Hist1906/>. Not constructed until after 1921 by the GBSR as part of the ‘Kosamba- Zankavao-Umarpada Line’.  
* ‘Zankavao-Vajipur Section’, 26 miles(42km) NG, surveyed in 1903 <ref name=Hist1906/>, ''apparently never constructed.''
*‘Zankavao-Vajipur Section’, 26 miles(42km) NG, surveyed in 1903 <ref name=Hist1906/>, apparently never constructed.
* ‘Nar-Nadiad Loop’ 20 miles(32km) NG,  surveyed in 1905 <ref name=Hist1906/>. Finally constructed as part of the ’Nar-Petlad-Nadiad Line’ via Sojitra, Dewa(Deva), opened after 1921 by GBSR.  
*‘Nar-Nadiad Loop’ 20 miles(32km) NG,  surveyed in 1905 <ref name=Hist1906/>. Finally constructed as part of the ’Nar-Petlad-Nadiad Line’ via Sojitra, Dewa(Deva), opened after 1921 by GBSR.  
* ‘Bahadarpur -Garda-Songhir Extension’, c 8 miles(13km) NG, proposed before  1906  from Bahadarpur (on the ‘Daboi-Bodeli Line’ ) due south to Garda on the Heran River <ref name=Hist1906/>. ''Apparently not constructed.''
*‘Miyagram-Sinor Branch’, c.20 miles(32km) NG, proposed 1906 <ref name=Hist1906/>. Opened in 1915 as part of the GDR  ’Miyaram Karjan-Malsar Extension’.   
* ‘Miyagram-Sinor Branch’, c.20 miles(32km) NG, proposed 1906 <ref name=Hist1906/>. Opened in 1915 as part of the GDR  ’Miyaram Karjan-Malsar Extension’.   
*‘Barodi-Savli Line’, 32 miles(51km) NG, proposed 1906 <ref name=Hist1906/>. The section Samlaya via Savli to Timba was opened in 1919. Baroda to Samlaya was completed after the GBSR took over in 1921.   
* ‘Barodi-Savli Line’, 32 miles(51km) NG, proposed 1906 <ref name=Hist1906/>. The section Samlaya via Savli to Timba was opened in 1919. Baroda to Samlaya was completed after the GBSR took over in 1921.   
*‘Choranda-Moti Koral Line’, 12 miles(19km) NG, sanctioned in 1914 for the GDR <ref name=Admin1918/>. Finally completed and opened by GBSR  in 1921 <ref name=Scholey>”Indian railways new chronology” by Keith Scholey</ref>.
* ‘Choranda-Moti Koral Line’, 12 miles(19km) NG, sanctioned in 1914 for the GDR <ref name=Admin1918/>. Finally completed and opened by GBSR  in 1921 <ref name=Scholey>”Indian railways new chronology” by Keith Scholey</ref>.
*‘Motipura -Taukhala Line’, 26 miles(42km) NG, sanctioned in 1914 for the GDR <ref name=Admin1918/>. Finally completed and opened by GBSR  in 1923 March 15 <ref name=Scholey/>.
* ‘Motipura -Taukhala Line’, 26 miles(42km) NG, sanctioned in 1914 for the GDR <ref name=Admin1918/>. Finally completed and opened by GBSR  in 1923 March 15 <ref name=Scholey/>.


==Further Information==
==Further Information==

Latest revision as of 15:18, 25 May 2020

Gaekwar's Dabhoi Railway
[[Image:|150px| ]]
Line of route
See map and text
Gauge / mileage
2'6" NG 92 miles(1909)
2'6" NG 154 miles(1918)
2'6" NG 187 miles(1919)
Timeline
Key locations
Presidency Bombay
Stations Baroda
System agency
Owned by Baroda Durbar
Worked by Bombay, Baroda and Central India Railway(B&CIR)
1921 Renamed Gaekwar's Baroda State Railway (GBSR)
How to interpret this infobox

The Gaekwar's Dabhoi Railway(GDR) was the original name of the ox-driven line between Dabhoi and and Mayagam (some records give this as ‘Mayagam Karjan, a distance of 20 miles(33km) and opened in 1862. The line was laid during the reign of Sir Khanderao Gaekwar of Baroda, the Maharaja of Baroda. Owned by the Princely Baroda State, it was the first railway built and operated by a Native Prince. [1] [2]. The network expanded finally becoming the Gaekwar's Baroda State Railway(GBSR) in 1921.

Note

  • Some records refer to this railway as the Dabhoi Railway
  • Some web record, including Wikipedia, incorrectly name this railway as the Gaekwar's Baroda State Railway; which in fact did not come into existence until 1921.

History

Gaekwar's Dabhoi Railway Bullock Hauled Train 1863

The original line was a 2ft 6in/762mm narrow gauge(NG) with rails weighing 13 lbs to a yard. The line was designed and constructed by Arthur William Forde. A pair of oxen used to haul trains composed of 4-6 vehicles. In 1863, Khanderao purchased 3 steam locomotives built by Neilson and Co., Glasgow. These 0-4-0 ST locomotives proved to be too heavy for the rails. During the reign of Malharrao in 1871, the old rails were removed and new rail 30 lbs to a yard were laid [3]. The 20mile(32km) ‘Dabhoi-Miyagam’ line was reopened for traffic on 8 April 1878 [4]. This is shown in Red as “Line A” on the Route Map.

An Agreement was made, effective from 1 Jan 1897, with the Bombay, Baroda and Central India Railway(BB&CIR) for the management, maintenance and working of the ‘Dabhoi Railway’ on behalf of the ‘Government of His Highness the Maharaja Gaekwar of Baroda’ [4]. It is not known if BB&CIR were responsible prior to this date. Certainly from this date onwards the BB&CIR were totally responsible for the operation.

Dabhoi by 1909 had become an important narrow gauge(NG) railway junction as the ‘Gaewar’s Dabhoi Railway’ was expanded; it became the centre where the lines from Miyagam, Chandod , Bodeli and Baroda converge [5]. These are marked “Lines B” on the map.

A Contract dated 8 April 1907, effective from 1 Jan 1906, between the Secretary of State and the BB&CIR formalised the arrangements for ‘the management, maintenance and working’ of the Dabhoi railway [4].

Further expansion of the network initiated an Agreement, dated 9 May 1916 between the ‘Government of His Highness the Maharaja Gaekwar of Baroda’ and the BB&CIR for the ‘management, maintenance and working, by the Company, of the Miyagam-Malsar (“Line D”), Dabhoi-Jarod-Samlaya (“Line E”), , Masor Road-Jambusar ("Line F”), Samlaya-Savli-Timba (“Line G”) ... from the dates they are or shall have been opened for public traffic’ [4].

With the completion of the ‘Dabhoi-Jarod’ Line’ in 1919 a total of 187 miles(299km) of ‘Gaekwars Dabhoi Railway’ was open [4].

The GDR became the narrow gauge(NG) part of the Gaekwar's Baroda State Railway (GBSR) on Oct 1st 1921 as result of the continued expansion or the network into Baroda State. At this time the NG system was 268 miles(429km) in length [6].

Gaekwars Dabhoi Railway marked with Routes up to 1921
Gaekwars Dabhoi Railway marked up on Google Map

Opening of ‘Gaekwar’s Dabhoi Railway’ lines in chronological order

Information retrieved from “Administration Report on Railways 1918” [4]

Note: Town Names – modern names in (brackets) as seen on Google Maps Baroda (Vadodora); Miyagam (Miyaram), Chhota Udaipur (Chhota Udepur)

  • ‘Dabhoi–Miyagam Line’ (“Red Line A”); 20 miles(32km) NG: 1862, the original Gaekwar's Dabhoi Railway, driven by oxen; 1873 Apr 4, line re-laid in stronger rails; 1878 Jan 8, date of reopening, locomotives introduced from about 1878.
  • ‘Dabhoi-Chandod Line’ (“Red Line B”); 11 miles(17km) NG: Dabhoi to Chandod, 11 miles(17km), 1879 Apr 15.
  • ‘Dabhoi-Bodeli Line’ (“Line B”); 22 miles(35km) NG: Dabhoi to Sankheda Bahadarpur, 10 miles(15km), 1879 Sep 17; Sankheda Bahadarpur via Chhuchapura Junction to Bodeli, 12 miles(20km), 1890 Jun 16.
  • ‘Dabhoi-Baroda Line’ (“Red Line B”); 19miles(34km) NG: Dabhoi to Goya Gate, 17 miles(31km), 1880 Jul 1; Goya Gate to Baroda (Vishvamitri Station), 2 miles(3km), 1881 Jan 24.
  • ‘Baroda-Masor Road Line’ (“Red Line C”); 20 miles(32km) NG: Baroda (Vishvamitri Station) to Padra, 7 miles(11km), 1897 Jul 1; Padra to Mobha, 6 miles(10km), 1903 Jul 10; Mobha to Masor Road, 7 miles(11km), 1904 Nov 1.
  • ‘Miyagam Karjan-Malsar Line’ (“Red Line D”); 24 miles(44km) NG: extension to the ‘Dabhoi-Miyaram Line’, first proposed in 1906 as the ‘GDR ‘ Miyagam-Sinor Branch’[7], and later extended giving total 44 miles(56km) from Miyagam via Choranda Junction and Sinor to Malsar, 1912 Jan 15
  • ‘Dabhoi-Timba Line’ (“Red Line E”) 62 miles(100km) NG: Daboi to Jarod, 24 miles(38km), 1913 Nov 15; Jarod to Samlaya Junction, 5 miles(9km), 1915 Dec 13; Samlaya via Savli to Timba, 33 miles(53km) 1919 Feb 1
  • ‘Masor Road-Jambusar Line’ (“Red Line F”); 7 miles(11km) NG: an extension of the ‘Baroda-Masor Road Line’ reaching Jambusar, 1917 May 1.

Lines Worked as an extension to Gaekwar’s Dabhoi Railway(GDR)

  • Bodeli-Chhota Udaipur Railway’ (“Green Line H”) 22.5 miles(36km) NG was sanctioned in 1915 and constructed by the BB&CIR on behalf of the; Baroda and Chota Udaipur Durbars. Opened in 1917 Dec 1, connected to the GDR ‘Daboi-Bodeli Line’ at Chhuchapura Junction and worked by BB&CIR [8]. The progress had been restricted by “the large contribution arising from lack of funds caused by the large contribution, both direct and indirect, which the Native States had made to the Imperial resources for the conduct of the war” [7].

Proposals and Surveys on behalf of the GDR

A number of projects were considered, some were abandoned and, several were postponed on account of WW1. The progress had been restricted by “the large contribution arising from lack of funds caused by the large contribution, both direct and indirect, which the Native States had made to the Imperial resources for the conduct of the war” [7]. Some were finally completed after 1921 by GBSR.

  • ‘Broach-Jambusar-Masor Road(Kangat) Branch’, 31 miles (50km) NG: proposed 1903 [7] The GDR ‘Masor Road-Jambusar Section’ was finally opened in 1917. The ‘Broach-Jambusar Railway’ was constructed by the BB&CIR and opened in Nov 1914. 1914 as a branch of the Bombay, Baroda and Central India Railway(BB&CIR) [9]
  • 'Kosamba-Zankavao Section’, 26 miles(42km) NG, surveyed in 1900 [7]. Not constructed until after 1921 by the GBSR as part of the ‘Kosamba- Zankavao-Umarpada Line’.
  • ‘Zankavao-Vajipur Section’, 26 miles(42km) NG, surveyed in 1903 [7], apparently never constructed.
  • ‘Nar-Nadiad Loop’ 20 miles(32km) NG, surveyed in 1905 [7]. Finally constructed as part of the ’Nar-Petlad-Nadiad Line’ via Sojitra, Dewa(Deva), opened after 1921 by GBSR.
  • ‘Bahadarpur -Garda-Songhir Extension’, c 8 miles(13km) NG, proposed before 1906 from Bahadarpur (on the ‘Daboi-Bodeli Line’ ) due south to Garda on the Heran River [7]. Apparently not constructed.
  • ‘Miyagram-Sinor Branch’, c.20 miles(32km) NG, proposed 1906 [7]. Opened in 1915 as part of the GDR ’Miyaram Karjan-Malsar Extension’.
  • ‘Barodi-Savli Line’, 32 miles(51km) NG, proposed 1906 [7]. The section Samlaya via Savli to Timba was opened in 1919. Baroda to Samlaya was completed after the GBSR took over in 1921.
  • ‘Choranda-Moti Koral Line’, 12 miles(19km) NG, sanctioned in 1914 for the GDR [4]. Finally completed and opened by GBSR in 1921 [10].
  • ‘Motipura -Taukhala Line’, 26 miles(42km) NG, sanctioned in 1914 for the GDR [4]. Finally completed and opened by GBSR in 1923 March 15 [10].

Further Information

For further development after 1921 see Gaekwar's Baroda State Railway.