Rohilkund and Kumaon Railway: Difference between revisions

Jump to navigation Jump to search
PEA-2292 (talk | contribs)
mNo edit summary
PEA-2292 (talk | contribs)
'Stations Infobox' info added
 
(2 intermediate revisions by the same user not shown)
Line 38: Line 38:
|headquarters= [[Izatnagar]]
|headquarters= [[Izatnagar]]
|workshop= [[Bareilly]]
|workshop= [[Bareilly]]
|stations= [[Bareilly]], [[Lucknow]], [[Mailani]], [[Pilibhit]], [[Shahjahanpur]]
|stations= [[Bareilly]], '''[[Lucknow]]''', [[Mailani]], [[Pilibhit]], [[Shahjahanpur]]
''See also separate page'' [[Lucknow_Railways_and_Stations#Lucknow_Stations| ''' Lucknow Junction Station''']] ''for details''
|system1date= 1943
|system1date= 1943
|system1details= [[Oudh and Tirhut Railway]]
|system1details= [[Oudh and Tirhut Railway]]
Line 119: Line 120:
Information mainly based on the  “Administration Report for Railways 1918” <ref name=Admin1918>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n204/mode/1up  "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 196]; Retrieved 8 Dec 2016</ref>.
Information mainly based on the  “Administration Report for Railways 1918” <ref name=Admin1918>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n204/mode/1up  "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 196]; Retrieved 8 Dec 2016</ref>.
*[[Bhojeepura-Kathgodam R&KR Mainline]]  from Bhojeepura (near [[Bareilly]]  to [[Kathgodam]] , 1884; 54 miles(84km)
*[[Bhojeepura-Kathgodam R&KR Mainline]]  from Bhojeepura (near [[Bareilly]]  to [[Kathgodam]] , 1884; 54 miles(84km)
**‘Kasganj Extension Line’ from  [[Bareilly]] to  Soron, 1885; to [[Kasganj]], 1906; 63 miles(100km)
**‘Kasganj Extension Line’ from  [[Bareilly]] to  Soron, 1885; to [[Kasganj]], 1906; 63 miles(100km).
**‘Ramnagar Extension Line’ from [[Moradabad]] to [[Ramnagar]], 1907-8; 48 miles(76km)  
**‘Ramnagar Extension Line’ from [[Moradabad]] via the ‘[[Ramganga Bridge]]'  to [[Ramnagar]], 1907-8; 48 miles(76km)
**‘Kashipur Extension Line’  from [[Lalkua]] to [[Kashipur]], 1907; 36 miles(57km)  
**‘Kashipur Extension Line’  from [[Lalkua]] to [[Kashipur]], 1907; 36 miles(57km). This line surveyed as [[Kichha-Kashipur Extension Survey| ‘Kichha-Kashipur Extension Survey’ ''-  see separate page'']]
**‘Shahjahanpur Extension Line’ from [[Pilibhit]]  1911; reaching [[Shahjahanpur]] 1916; 56 miles(89km)
**‘Shahjahanpur Extension Line’ from [[Pilibhit]]  1911; reaching [[Shahjahanpur]] 1916; 56 miles(89km)


Line 129: Line 130:


==Lines Surveyed/Proposed by R&KR==
==Lines Surveyed/Proposed by R&KR==
* [[Kichha-Kashipur Extension Survey| ‘Kichha-Kashipur Extension Survey’ ''-  see separate page'']]  surveyed 1894-98 which became the ‘R&KR Kasganj Extension Line’ listed above
* ‘Kathgodam-Nainital Branch’, proposed by private enterprise in 1895 for the development of Kuaon and Nainitial districts. It was to be a 2ft/610mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) line, 13 miles(21km) line at estimated cost RS.12 lakhs. The concession lapsed in 1898 <ref name=History1906>[https://archive.org/stream/RailwayProjects/Railway%20projects#page/n80/mode/1up “Histories of (Indian)Railway Projects ...up to June 1906” page 42]; Retrieved 3 Oct 2017</ref>.
* ‘Kathgodam-Nainital Branch’, proposed by private enterprise in 1895 for the development of Kuaon and Nainitial districts. It was to be a 2ft/610mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) line, 13 miles(21km) line at estimated cost RS.12 lakhs. The concession lapsed in 1898 <ref name=History1906>[https://archive.org/stream/RailwayProjects/Railway%20projects#page/n80/mode/1up “Histories of (Indian)Railway Projects ...up to June 1906” page 42]; Retrieved 3 Oct 2017</ref>.
* ‘Philibhit-Sitapur Railway’, sanctioned for survey 1905-6; MG line from [[Pilibhit]]  - Bisalpur to [[Shahjahanpur]] and thence to [[Sitapur]], a length of about 105 miles(168km) <ref name=History1906/>.  
* ‘Philibhit-Sitapur Railway’, sanctioned for survey 1905-6; MG line from [[Pilibhit]]  - Bisalpur to [[Shahjahanpur]] and thence to [[Sitapur]], a length of about 105 miles(168km) <ref name=History1906/>.