Sutlej Valley Railway: Difference between revisions
Jump to navigation
Jump to search
Created page with "'''Sutlej Valley Railway''' Merged into SPR(qv), 1917-18; aquired by State and merged into NWR, 1930 {{Work-in-Progress-Rly}} Category:Railways" |
'Kasur-Lodhran Railway' link added |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
The [[Sutlej Valley Railway]] was opened in 1910 as part of Sutlej Valley Irrigation project. The line was constructed and worked by [[Southern Punjab Railway]] | |||
The [[Kasur-Lodhran Railway]] section - ‘However from 1914 onwards, owing to the First World War, which caused financial strigencyt, developments of railways stagnated....in order to meet the necessities of the military authorities the Sutlej Valley Railway, from [[Kasur]] to [[Lodharan]], with 208 miles of track, was dismantled in 1917.<ref>[https://books.google.co.uk/books?id=L1RGX3whGEIC&pg=PA81&lpg=PA81&dq=Sutlej+Valley+Railway&source=bl&ots=OTgfyY8yx5&sig=MIqEW4D7w7kbSYsL28yzUNbav6w&hl=en&sa=X&ei=Vzw-VfKmE9SM7AaNloAI&ved=0CCgQ6AEwAQ#v=snippet&q=Sutlej%20Valley%20%20&f=false Google Books "Punjab, the Crucial Decade (1911-1920)" by Subash Chander Sharma; page 81]; Retrieved 14 Dec 2015</ref> | |||
<ref>[https://books.google.co.uk/books?id=TPB5RTODBJAC&pg=PA190&lpg=PA190&dq=Sutlej+Valley+Railway&source=bl&ots=6f707jWIAy&sig=yO_2ojIxGimO4WvebISn8nmDkeU&hl=fr&sa=X&ved=0ahUKEwjrqeXSiMfJAhXEPBQKHSKODbwQ6AEIWDAJ#v=onepage&q=Sutlej%20Valley%20Railway&f=false Google Books "India's Railway History: A Research Handbook" by John Hurd II,Ian J. Kerr ; page 190 footnote 13]; Retrieved 14 Dec 2015</ref> | |||
== References == | |||
<references /> | |||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:State Railways]] |
Latest revision as of 06:40, 8 April 2016
The Sutlej Valley Railway was opened in 1910 as part of Sutlej Valley Irrigation project. The line was constructed and worked by Southern Punjab Railway
The Kasur-Lodhran Railway section - ‘However from 1914 onwards, owing to the First World War, which caused financial strigencyt, developments of railways stagnated....in order to meet the necessities of the military authorities the Sutlej Valley Railway, from Kasur to Lodharan, with 208 miles of track, was dismantled in 1917.[1] [2]