Rajpura-Bhatinda Railway: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
Fully checked; 1918 Admin Report link changed; "Further Information" added with link |
||
(2 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
|route= [[Rajpura]] to [[Bhatinda]] | |route= [[Rajpura]] to [[Bhatinda]] | ||
|gauge1= Broad gauge | |gauge1= Broad gauge | ||
|gauge1details= | |gauge1details= 108 miles (1905) | ||
|gauge2= | |gauge2= | ||
|gauge2details= | |gauge2details= | ||
Line 31: | Line 31: | ||
}} | }} | ||
Originally named the '''Rajpura-Pattiala Railway''', the '''Rajpura-Bhatinda Railway''' was a broad gauge connecting line between [[Rajpura]], to the north-west of [[Ambala]], and the important junction at [[Bhatinda]]. | Originally named the '''Rajpura-Pattiala Railway''', the '''Rajpura-Bhatinda Railway''' was a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) connecting line between [[Rajpura]], to the north-west of [[Ambala]], and the important junction at [[Bhatinda]] a distance of 108 miles(172km). The first section opened in 1884 and completed in 1889. | ||
The railway was worked by [[North Western Railway]](NWR) | |||
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n125/mode/2up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 117]; Retrieved 11 Feb 2016</ref> | |||
==Further Information== | |||
See '''[[North Western Railway]]''' | |||
== References == | |||
<references /> | |||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category: | [[Category:State Railways]] |
Latest revision as of 17:07, 11 February 2016
Rajpura-Bhatinda Railway | ||
---|---|---|
[[Image:|150px| ]] | ||
Line of route | ||
Rajpura to Bhatinda | ||
Gauge / mileage | ||
Broad gauge | 108 miles (1905) | |
Timeline | ||
Key locations | ||
Presidency | Bengal | |
Stations | Dhuri, Nabha, Patiala | |
System agency | ||
Worked by North Western Railway | ||
How to interpret this infobox |
Originally named the Rajpura-Pattiala Railway, the Rajpura-Bhatinda Railway was a broad gauge(BG) connecting line between Rajpura, to the north-west of Ambala, and the important junction at Bhatinda a distance of 108 miles(172km). The first section opened in 1884 and completed in 1889. The railway was worked by North Western Railway(NWR) [1]