Madari Hat Branch Railway: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
Fully checked; Further Info added with link, text added. |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
The '''Madari Hat Branch Railway''' was a branch line of [[Bengal Dooars Railway]] | The '''Madari Hat Branch Railway''' was a branch line of [[Bengal Dooars Railway]]. | ||
The metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) line with a total length of 44 miles(70km) opened in 1901 and completed in 1903. | |||
The line opened 1901 | |||
Mal Junction to Chalsa (5 miles)- opened 1 April 1901; Chalsa to Chengmari (14 miles) - opened 1 January 1903; Chengmari to Dalgaon (16 miles) - opened 23 March 1903; Dalgaon to [[Madari Hat]] (9 miles) - opened 14 June 1903. | |||
==Further Information== | |||
See '''[[Bengal Dooars Railway]]''' | |||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:Assisted Railways]] | [[Category:Assisted Railways]] |
Latest revision as of 06:21, 9 February 2016
The Madari Hat Branch Railway was a branch line of Bengal Dooars Railway. The metre gauge(MG) line with a total length of 44 miles(70km) opened in 1901 and completed in 1903.
Mal Junction to Chalsa (5 miles)- opened 1 April 1901; Chalsa to Chengmari (14 miles) - opened 1 January 1903; Chengmari to Dalgaon (16 miles) - opened 23 March 1903; Dalgaon to Madari Hat (9 miles) - opened 14 June 1903.