Assam-Behar State Railway: Difference between revisions
Jump to navigation
Jump to search
References replacing External Links |
External Link format corrected |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
The '''Assam-Behar State Railway'''(ABSR) | The '''Assam-Behar State Railway'''(ABSR) was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) Indian State Railway. The line was built westward from [[Paratipur]] in 1884 and by 1889 was connected with [[Katihar]]. | ||
The railway, jointly owned by [[Assam State]] and [[Behar State]] from [[Paratipur]](now in Banglasdesh) to [[Katihar]], was taken into Government of India([[Government of India |GoI]]) management in 1942. | |||
No information has been found concerning the working of this railway. It linked to the system of lines worked by [[Assam-Bengal Railway]](ABR) and was probably worked by ABR. | |||
With the partition of India in 1947 railway links between India and Bangladesh were severed. The line was divided but both Katihar and Parbatipur continued to be important railway junctions. | With the partition of India in 1947 railway links between India and Bangladesh were severed. The line was divided but both Katihar and Parbatipur continued to be important railway junctions. | ||
== | == External Links == | ||
*[https://en.wikipedia.org/wiki/Parbatipur_railway_station "Parbatipur Railway Station"] Wikipedia | |||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:Indian States Railways]] | [[Category:Indian States Railways]] |
Latest revision as of 13:57, 17 January 2016
The Assam-Behar State Railway(ABSR) was a metre gauge(MG) Indian State Railway. The line was built westward from Paratipur in 1884 and by 1889 was connected with Katihar.
The railway, jointly owned by Assam State and Behar State from Paratipur(now in Banglasdesh) to Katihar, was taken into Government of India(GoI) management in 1942.
No information has been found concerning the working of this railway. It linked to the system of lines worked by Assam-Bengal Railway(ABR) and was probably worked by ABR.
With the partition of India in 1947 railway links between India and Bangladesh were severed. The line was divided but both Katihar and Parbatipur continued to be important railway junctions.
External Links
- "Parbatipur Railway Station" Wikipedia