Trans Indus (Kalabagh-Bannu) Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Revised information added with references
PEA-2292 (talk | contribs)
Map added, sub heading and text clarified
 
Line 1: Line 1:
The '''Trans Indus (Kalabagh-Bannu) Railway''' (KBR) was a 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) line, the first section between [[Kalabagh]] and [[Bannu]], 89 miles(142km) opened in  1913 <ref name=Admin129>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n137/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta; page 129]; Retrieved 3 Dec 2017</ref>.
The '''Trans Indus (Kalabagh-Bannu) Railway''' (KBR) was a 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) line, the first section between [[Kalabagh]] and [[Bannu]], 89 miles(142km) opened in  1913.
[[File:Trans Indus (Kalabagh-Bannu) Railway.png|thumb|'''Trans Indus (Kalabagh-Bannu) Railway''']]


The line initially ran from [[Kalabagh]] where there was a ferry over the Indus River (which was replaced by a bridge in 1931) to [[Bannu]] at the head of the Tochi Valley, which was the main route from India into Afghanistan. Construction of the line had commenced by 1911 using equipment on loan from the [[Light Military Reserve Railway| Light Military Reserve Railway - see separate page for information]] <ref name =IA05>“Industrial Railways and Locomotives of India and South Asia” compiled by Simon Darvill. Published by ‘The Industrial Railway Society’ 2013. ISBN 978 1 901556 82-7. Available at  http://irsshop.co.uk/India. Reference:  Entry  IA05  page ....</ref>.
The line initially ran from [[Kalabagh]] where there was a ferry over the Indus River (which was replaced by a bridge in 1931) to [[Bannu]] at the head of the Tochi Valley, which was the main route from India into Afghanistan. Construction of the line had commenced by 1911 using equipment on loan from the [[Light Military Reserve Railway| Light Military Reserve Railway - ''see separate page for information'']] <ref name =IA05>“Industrial Railways and Locomotives of India and South Asia” compiled by Simon Darvill. Published by ‘The Industrial Railway Society’ 2013. ISBN 978 1 901556 82-7. Available at  http://irsshop.co.uk/India. Reference:  Entry  IA05  page ....</ref>.


In 1913 locomotives were purchased from the [[Kalka-Simla Railway]] for further construction work:-
In 1913 locomotives were purchased from the [[Kalka-Simla Railway]] for further construction work:-
*‘Tank Extension Branch Line’ opened in May 1916.  This extension from Laki Marwat via Pezu was a further 46 miles(73km) to reach [[Tank]].
<ref name=Admin129/>
*‘Tank to Kaur and Khorgi Branch Line’ was constructed from 1919 and opened in early 1920
*‘[[Tank to Dera Ismail Khan  Portable Railway]]’  constructed in 1920 [[Tank to Dera Ismail Khan  Portable Railway|''- see separate page for information'']]


The line was worked by, and finally merged into, the [[North Western Railway]](NWR) with ownership of the line being passed over in Apr 1921
==Line Extensions==
*‘Laki Marwat to Tank  Branch Line’ opened in May 1916.  This extension was a further 46 miles(73km) to reach [[Tank]] <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n137/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta; page 129]; Retrieved 3 Dec 2017</ref>
* ‘Tank to Kaur and Khorgi Branch Line’ commenced during the Warizistan unrest of 1919. This from 1919 and opened in early 1920 <ref>[https://www.irfca.org/docs/locolists/industrial/display.php?file=Military.txt&title=Military%20Trains IRFCA “Military Trains” ''– This has not been corroborated and no further information  has been found'']; Retrieved 198 Nov 2018</ref>
*‘[[Tank to Dera Ismail Khan  Portable Railway]]’  constructed in 1920 [[Tank to Dera Ismail Khan  Portable Railway|- ''see separate page for information'']]
 
 
The railways were worked by and finally merged into [[North Western Railway]](NWR) with ownership of the line being passed to NWR in Apr 1921


==Further Information==
==Further Information==

Latest revision as of 08:57, 19 November 2018

The Trans Indus (Kalabagh-Bannu) Railway (KBR) was a 2ft 6in/762mm narrow gauge(NG) line, the first section between Kalabagh and Bannu, 89 miles(142km) opened in 1913.

Trans Indus (Kalabagh-Bannu) Railway

The line initially ran from Kalabagh where there was a ferry over the Indus River (which was replaced by a bridge in 1931) to Bannu at the head of the Tochi Valley, which was the main route from India into Afghanistan. Construction of the line had commenced by 1911 using equipment on loan from the Light Military Reserve Railway - see separate page for information [1].

In 1913 locomotives were purchased from the Kalka-Simla Railway for further construction work:-

Line Extensions


The railways were worked by and finally merged into North Western Railway(NWR) with ownership of the line being passed to NWR in Apr 1921

Further Information

See North Western Railway

References

  1. “Industrial Railways and Locomotives of India and South Asia” compiled by Simon Darvill. Published by ‘The Industrial Railway Society’ 2013. ISBN 978 1 901556 82-7. Available at http://irsshop.co.uk/India. Reference: Entry IA05 page ....
  2. "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 129; Retrieved 3 Dec 2017
  3. IRFCA “Military Trains” – This has not been corroborated and no further information has been found; Retrieved 198 Nov 2018