Nalhati-Azimganj Railway: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
Line 1: | Line 1: | ||
'''Nalhati-Azimganj Railway''', the original section of the line constructed in 1863 by [[Indian Branch Railway]]. The line used a | '''Nalhati-Azimganj Railway''', the original section of the line constructed in 1863 by [[Indian Branch Railway]]. The line used a 4ft(1222mm) [[Rail_gauge_#4 foot Gauge|unique rail gauge]]. | ||
Worked by [[Oudh and Rohilkhand Railway]] (O&RR), 1863-72; run as State Rly, 1872; leased to [[East Indian Railway]] (EIR), 1892 | Worked by [[Oudh and Rohilkhand Railway]] (O&RR), 1863-72; run as State Rly, 1872; leased to [[East Indian Railway]] (EIR), 1892 |
Revision as of 16:45, 17 September 2015
Nalhati-Azimganj Railway, the original section of the line constructed in 1863 by Indian Branch Railway. The line used a 4ft(1222mm) unique rail gauge.
Worked by Oudh and Rohilkhand Railway (O&RR), 1863-72; run as State Rly, 1872; leased to East Indian Railway (EIR), 1892