Netrakona-Mohanganj Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
mNo edit summary
PEA-2292 (talk | contribs)
Data added, links checked, Work-in-progress removed, References added
Line 1: Line 1:
'''Netrakona-Mohanganj Railway'''
The '''Netrakona–Mohanganj Railway''' was constructed between 1912 and 1918 by the Mymensingh–Bhairab Bazar Railway Company .


It was branch-line connecting to the Dacca Section of the [[Eastern Bengal Railway]] (EBR) (Narayanganj to Bahadurabad Ghat section) and was worked  EBR).
<ref>[https://en.wikipedia.org/wiki/Narayanganj%E2%80%93Bahadurabad_Ghat_line] Wikipedia Narayanganj - Bahadurabad Ghat Line</ref>


Constructed 1912-18, worked by ABR(qv); part of privately owned  [[Mymensingh-Bhairab Bazar Railway]]
The line was taken over by the  government in 1948–49 and is now under the jurisdiction of Bangladesh Railway
 
== References ==
<references />


{{Work-in-Progress-Rly}}


[[Category:Railways]]
[[Category:Railways]]
[[Category:Private Railways]]
[[Category:Private Railways]]

Revision as of 05:32, 30 November 2015

The Netrakona–Mohanganj Railway was constructed between 1912 and 1918 by the Mymensingh–Bhairab Bazar Railway Company .

It was branch-line connecting to the Dacca Section of the Eastern Bengal Railway (EBR) (Narayanganj to Bahadurabad Ghat section) and was worked EBR). [1]

The line was taken over by the government in 1948–49 and is now under the jurisdiction of Bangladesh Railway

References

  1. [1] Wikipedia Narayanganj - Bahadurabad Ghat Line