Netrakona-Mohanganj Railway: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
Data added, links checked, Work-in-progress removed, References added |
||
Line 1: | Line 1: | ||
''' | The '''Netrakona–Mohanganj Railway''' was constructed between 1912 and 1918 by the Mymensingh–Bhairab Bazar Railway Company . | ||
It was branch-line connecting to the Dacca Section of the [[Eastern Bengal Railway]] (EBR) (Narayanganj to Bahadurabad Ghat section) and was worked EBR). | |||
<ref>[https://en.wikipedia.org/wiki/Narayanganj%E2%80%93Bahadurabad_Ghat_line] Wikipedia Narayanganj - Bahadurabad Ghat Line</ref> | |||
The line was taken over by the government in 1948–49 and is now under the jurisdiction of Bangladesh Railway | |||
== References == | |||
<references /> | |||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:Private Railways]] | [[Category:Private Railways]] |
Revision as of 05:32, 30 November 2015
The Netrakona–Mohanganj Railway was constructed between 1912 and 1918 by the Mymensingh–Bhairab Bazar Railway Company .
It was branch-line connecting to the Dacca Section of the Eastern Bengal Railway (EBR) (Narayanganj to Bahadurabad Ghat section) and was worked EBR). [1]
The line was taken over by the government in 1948–49 and is now under the jurisdiction of Bangladesh Railway