'''Bezwada-Masulipatam Railway''' | '''Bezwada-Masulipatam Railway''' | ||
Bezwada ( | The [[Kistna District Board]] raised funds to construct the branch feeder line from [[Bezwada]] to [[Masulipatam]] to connect with the [[Madras and Southern Mahratta Railway]](M&SMR). | ||
The line was completed in 1908, worked by M&MSR | |||
[[Category:District Railway Boards]] | [[Category:District Railway Boards]] | ||
[[Category:Railways]] | [[Category:Railways]] |
Revision as of 07:20, 8 November 2015
Bezwada-Masulipatam Railway
The Kistna District Board raised funds to construct the branch feeder line from Bezwada to Masulipatam to connect with the Madras and Southern Mahratta Railway(M&SMR).
The line was completed in 1908, worked by M&MSR