Netrakona-Mohanganj Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Data added, links checked, Work-in-progress removed, References added
PEA-2292 (talk | contribs)
mNo edit summary
Line 1: Line 1:
The '''Netrakona–Mohanganj Railway''' was constructed between 1912 and 1918 by the Mymensingh–Bhairab Bazar Railway Company .  
The '''Netrakona–Mohanganj Railway''' was constructed between 1912 and 1918 by the Mymensingh–Bhairab Bazar Railway Company .  


It was branch-line connecting to the Dacca Section of the [[Eastern Bengal Railway]] (EBR) (Narayanganj to Bahadurabad Ghat section) and was worked EBR).
It was branch-line connecting to the Dacca Section of the [[Eastern Bengal Railway]] (EBR) (Narayanganj to Bahadurabad Ghat section) and was worked by EBR.
<ref>[https://en.wikipedia.org/wiki/Narayanganj%E2%80%93Bahadurabad_Ghat_line] Wikipedia Narayanganj - Bahadurabad Ghat Line</ref>
<ref>[https://en.wikipedia.org/wiki/Narayanganj%E2%80%93Bahadurabad_Ghat_line] Wikipedia Narayanganj - Bahadurabad Ghat Line</ref>



Revision as of 05:33, 30 November 2015

The Netrakona–Mohanganj Railway was constructed between 1912 and 1918 by the Mymensingh–Bhairab Bazar Railway Company .

It was branch-line connecting to the Dacca Section of the Eastern Bengal Railway (EBR) (Narayanganj to Bahadurabad Ghat section) and was worked by EBR. [1]

The line was taken over by the government in 1948–49 and is now under the jurisdiction of Bangladesh Railway

References

  1. [1] Wikipedia Narayanganj - Bahadurabad Ghat Line