Netrakona-Mohanganj Railway: Difference between revisions
Jump to navigation
Jump to search
Data added, links checked, Work-in-progress removed, References added |
mNo edit summary |
||
Line 1: | Line 1: | ||
The '''Netrakona–Mohanganj Railway''' was constructed between 1912 and 1918 by the Mymensingh–Bhairab Bazar Railway Company . | The '''Netrakona–Mohanganj Railway''' was constructed between 1912 and 1918 by the Mymensingh–Bhairab Bazar Railway Company . | ||
It was branch-line connecting to the Dacca Section of the [[Eastern Bengal Railway]] (EBR) (Narayanganj to Bahadurabad Ghat section) and was worked | It was branch-line connecting to the Dacca Section of the [[Eastern Bengal Railway]] (EBR) (Narayanganj to Bahadurabad Ghat section) and was worked by EBR. | ||
<ref>[https://en.wikipedia.org/wiki/Narayanganj%E2%80%93Bahadurabad_Ghat_line] Wikipedia Narayanganj - Bahadurabad Ghat Line</ref> | <ref>[https://en.wikipedia.org/wiki/Narayanganj%E2%80%93Bahadurabad_Ghat_line] Wikipedia Narayanganj - Bahadurabad Ghat Line</ref> | ||
Revision as of 05:33, 30 November 2015
The Netrakona–Mohanganj Railway was constructed between 1912 and 1918 by the Mymensingh–Bhairab Bazar Railway Company .
It was branch-line connecting to the Dacca Section of the Eastern Bengal Railway (EBR) (Narayanganj to Bahadurabad Ghat section) and was worked by EBR. [1]
The line was taken over by the government in 1948–49 and is now under the jurisdiction of Bangladesh Railway