Bhavnagar Tramway: Difference between revisions
Jump to navigation
Jump to search
References relacing External Links |
Category:Narrow Gauge (NG) Railways added] |
||
Line 10: | Line 10: | ||
[[Category:Tramways]] | [[Category:Tramways]] | ||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:Narrow Gauge (NG) Railways]] |
Revision as of 17:15, 21 December 2015
Bhavnagar Tramway
The Bhavnagar Tramway was a 2 ft 6 in (762 mm) narrow gauge railway built by the Bhavnagar State, India. The first section was built in 1926 from Bhavnagar south to Talaja, and then extended to Mahuva in 1938. The total length of the tramway was 67.5 miles. The tramway used small 4-8-0 locomotives, later classified as the “T” class. In 1947 the tramway was taken over by the Saurashtra Railway, and later by the Western Railway.
[1]
References
- ↑ Wikipedia "Bhavnagar Tramway";Retrieved 9 Dec 2015