Darjeeling-Himalayan Extensions Railway: Difference between revisions
Jump to navigation
Jump to search
Fully checked; Further Info added with link |
Full revision with refs and map |
||
Line 1: | Line 1: | ||
[[File:Darjeeling-Himalayan Extensions Railway.png|thumb|Darjeeling-Himalayan Extensions Railway]] | |||
'''Darjeeling-Himalayan Extensions Railway''' | '''Darjeeling-Himalayan Extensions Railway''' | ||
1913 extensions to the [[Darjeeling-Himalayan Railway]](DHR), technically a separate company but worked by (DHR) | 1913-14 extensions to the [[Darjeeling-Himalayan Railway]](DHR), technically a separate company but worked by (DHR)<ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n249/mode/1up “Administration Report on Railways 1918” page 240 (pdf249)]; Retrieved 19 Aug 2020</ref>. | ||
* ‘Kissengunge Extension’, 66 miles(107km), opened 1914-15, from Panchanai to Kissengunge via Matigara, Naksalbari, Taabpur, Islampur-Aluabari, | |||
* ‘Teesia Valley Extension’, 29 miles(47km), opened 1914-15 from Siliguri to Kalimpng Road via Sivoke and Riyang | |||
The ‘Statistics of Working’ show the year-by-year financial results for this ‘Extensions Railway’ from 1913-14 through to 1936-37 and open mileage rising from 14¼ miles(23km) reaching 95 miles (154km) from 1915-16 onwards <ref name=Hist1937>[https://ia801605.us.archive.org/30/items/in.ernet.dli.2015.36650/2015.36650.India-Railway-Board-History-Of-Indian-Railways-Constructed-And-In-Progress.pdf US Archive .org pdf download of ‘History Of Indian Railways, constructed and in progress’, 31 March 1937 by ‘The Government of India - Railway Department’ page 227, pdf 270]; Retrieved 19 Aug 2020</ref>. | |||
== Classification == | |||
[[Indian Railway Classification]] of 1926 - Class II railway system. | |||
==Further Information== | ==Further Information== | ||
See '''[[Darjeeling-Himalayan Railway]]''' | See '''[[Darjeeling-Himalayan Railway]]''' | ||
== References == | |||
<references /> | |||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:Assisted Railways]] | [[Category:Assisted Railways]] | ||
[[Category:Indian Railways]] | |||
[[Category:Narrow Gauge (NG) Railways]] | [[Category:Narrow Gauge (NG) Railways]] |
Latest revision as of 14:49, 19 August 2020
Darjeeling-Himalayan Extensions Railway
1913-14 extensions to the Darjeeling-Himalayan Railway(DHR), technically a separate company but worked by (DHR)[1].
- ‘Kissengunge Extension’, 66 miles(107km), opened 1914-15, from Panchanai to Kissengunge via Matigara, Naksalbari, Taabpur, Islampur-Aluabari,
- ‘Teesia Valley Extension’, 29 miles(47km), opened 1914-15 from Siliguri to Kalimpng Road via Sivoke and Riyang
The ‘Statistics of Working’ show the year-by-year financial results for this ‘Extensions Railway’ from 1913-14 through to 1936-37 and open mileage rising from 14¼ miles(23km) reaching 95 miles (154km) from 1915-16 onwards [2].
Classification
Indian Railway Classification of 1926 - Class II railway system.
Further Information
See Darjeeling-Himalayan Railway