Nalhati-Azimganj Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
mNo edit summary
PEA-2292 (talk | contribs)
mNo edit summary
Line 1: Line 1:
'''Nalhati-Azimganj Railway''', the original section of the line constructed in 1863 by [[Indian Branch Railway]]. The line used a  unique 4ft(1222mm) rail gauge. See [[Rail_gauge]]  
'''Nalhati-Azimganj Railway''', the original section of the line constructed in 1863 by [[Indian Branch Railway]]. The line used a  4ft(1222mm) [[Rail_gauge_#4 foot Gauge|unique rail gauge]]


Worked by [[Oudh and Rohilkhand Railway]] (O&RR), 1863-72; run as State Rly, 1872; leased to [[East Indian Railway]] (EIR), 1892
Worked by [[Oudh and Rohilkhand Railway]] (O&RR), 1863-72; run as State Rly, 1872; leased to [[East Indian Railway]] (EIR), 1892

Revision as of 16:45, 17 September 2015

Nalhati-Azimganj Railway, the original section of the line constructed in 1863 by Indian Branch Railway. The line used a 4ft(1222mm) unique rail gauge.

Worked by Oudh and Rohilkhand Railway (O&RR), 1863-72; run as State Rly, 1872; leased to East Indian Railway (EIR), 1892