Bengal Provincial Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Data added, links checked
PEA-2292 (talk | contribs)
No edit summary
Line 31: Line 31:
}}
}}


The '''Bengal Provincial Railway Company''' (BPR) was formed c.1884. This private line was opened in  1885; a short (33 mile) 2' 6" narrow gauge railway from [[Magra]] (in [[Hooghly]] district) to [[Tarakeshwar]], an important place of pilgrimage for the Shiva sect.
The '''Bengal Provincial Railway Company''' (BPR) was formed c.1884.  


This Narrow Gauge([[Rail_gauge#Narrow_Gauge|NG]]) line was formerly known as [[Tarakeshwar Magra Railway]]; closed 1956
This private line was opened in  1885; a short (33 mile) 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) railway from [[Magra]] (in [[Hooghly]] district) to [[Tarakeshwar]], an important place of pilgrimage for the Shiva sect.


==Lines worked by BPR at some time==
This NG line was formerly known as [[Tarakeshwar Magra Railway]]
*[[Dasghara-Jamalpurgunj Railway]], opened 1917-18. Owned by  [[Darjeeling-Himalayan Railway]]; worked by BPR, 1919
 
The line closed in 1956.
 
The [[Dasghara-Jamalpurgunj Railway]], opened 1919 as an extension to the BPR.


[[Category:Railways]]
[[Category:Railways]]
[[Category:Private Railways]]
[[Category:Private Railways]]

Revision as of 11:37, 16 November 2015

Bengal Provincial Railway
[[Image:|150px| ]]
Line of route
Magra to Tarakeshwar
Gauge / mileage
2' 6" NG 33 miles (1905)
42 miles (1943)
Timeline
1894 Construction started
1917 Dasghara-Jamalpurganj line planned
Key locations
Presidency Bengal
Stations Magra, Tarakeshwar
System agency
Own agency
How to interpret this infobox

The Bengal Provincial Railway Company (BPR) was formed c.1884.

This private line was opened in 1885; a short (33 mile) 2ft 6in/762mm narrow gauge(NG) railway from Magra (in Hooghly district) to Tarakeshwar, an important place of pilgrimage for the Shiva sect.

This NG line was formerly known as Tarakeshwar Magra Railway

The line closed in 1956.

The Dasghara-Jamalpurgunj Railway, opened 1919 as an extension to the BPR.