Kistna District Board: Difference between revisions
Jump to navigation
Jump to search
Data added, links checked, Work-in-progress removed |
m internal links |
||
Line 1: | Line 1: | ||
District Board owner of [[Bezwada-Masulipatam Railway]] | District Board owner of [[Bezwada-Masulipatam Railway]] | ||
The Kistna District Board raised funds to construct the branch feeder line from Bezwada to Masulipatam to connect with the [[Madras and Southern Mahratta Railway]](M&SMR). The line was completed in 1908, worked by M&MSR | The Kistna District Board raised funds to construct the branch feeder line from [[Bezwada]] to [[Masulipatam]] to connect with the [[Madras and Southern Mahratta Railway]](M&SMR). The line was completed in 1908, worked by M&MSR | ||
[[Category:District Railway Boards]] | [[Category:District Railway Boards]] | ||
[[Category:Railways]] | [[Category:Railways]] |
Latest revision as of 21:12, 16 November 2015
District Board owner of Bezwada-Masulipatam Railway
The Kistna District Board raised funds to construct the branch feeder line from Bezwada to Masulipatam to connect with the Madras and Southern Mahratta Railway(M&SMR). The line was completed in 1908, worked by M&MSR