Difference between revisions of "Faridpur Branch Railway"
Jump to navigation
Jump to search
(Data added, links checked, Work-in-progress removed) |
(Fully checked; Further Info added with link) |
||
Line 3: | Line 3: | ||
It was a branch of the [[Poradah Branch Railway]] that had been constructed by [[Northern Bengal State Railway]](NBSR) but worked by EBR, later apparently taken over by EBR c.1913 | It was a branch of the [[Poradah Branch Railway]] that had been constructed by [[Northern Bengal State Railway]](NBSR) but worked by EBR, later apparently taken over by EBR c.1913 | ||
− | + | ==Further Infortmation== | |
+ | See '''[[Eastern Bengal Railway]]''' | ||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:State Railways]] | [[Category:State Railways]] |
Revision as of 11:38, 3 February 2016
The Faridpur Branch Railway was a Eastern Bengal Railway(EBR) branch line. The line opened in 1898-99.
It was a branch of the Poradah Branch Railway that had been constructed by Northern Bengal State Railway(NBSR) but worked by EBR, later apparently taken over by EBR c.1913