Faridpur Branch Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Data added, links checked, Work-in-progress removed
PEA-2292 (talk | contribs)
Fully checked; Further Info added with link
Line 3: Line 3:
It was a branch of the [[Poradah Branch Railway]] that had been constructed by [[Northern Bengal State Railway]](NBSR) but worked by EBR, later apparently taken over by EBR c.1913  
It was a branch of the [[Poradah Branch Railway]] that had been constructed by [[Northern Bengal State Railway]](NBSR) but worked by EBR, later apparently taken over by EBR c.1913  


 
==Further Infortmation==
See '''[[Eastern Bengal Railway]]'''




[[Category:Railways]]
[[Category:Railways]]
[[Category:State Railways]]
[[Category:State Railways]]

Revision as of 11:38, 3 February 2016

The Faridpur Branch Railway was a Eastern Bengal Railway(EBR) branch line. The line opened in 1898-99.

It was a branch of the Poradah Branch Railway that had been constructed by Northern Bengal State Railway(NBSR) but worked by EBR, later apparently taken over by EBR c.1913

Further Infortmation

See Eastern Bengal Railway