Trans Indus (Kalabagh-Bannu) Railway: Difference between revisions
Jump to navigation
Jump to search
1918 Admin Report details checked/added/corrected |
Fully checked; 1918 Admin Report link changed; "Further Information" added with link |
||
Line 1: | Line 1: | ||
The '''Trans Indus (Kalabagh-Bannu) Railway''' was a2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) line, the first section between [[Kalabagh]] and [[Bannu]], 89 miles(142km) opened in 1913. The line was extended by a further 46 miles(73km) in 1916 to reach [[Tank]]. | The '''Trans Indus (Kalabagh-Bannu) Railway''' was a2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) line, the first section between [[Kalabagh]] and [[Bannu]], 89 miles(142km) opened in 1913. The line was extended by a further 46 miles(73km) in 1916 to reach [[Tank]]. | ||
<ref>[https:// | <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n137/mode/2up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 129]; Retrieved 21 Dec 2015</ref> | ||
The line was worked by and finally merged into [[North Western Railway]](NWR.) | The line was worked by and finally merged into [[North Western Railway]](NWR.) | ||
==Further Information== | |||
See '''[[North Western Railway]]''' | |||
== References == | == References == |
Revision as of 07:17, 14 February 2016
The Trans Indus (Kalabagh-Bannu) Railway was a2ft 6in/762mm narrow gauge(NG) line, the first section between Kalabagh and Bannu, 89 miles(142km) opened in 1913. The line was extended by a further 46 miles(73km) in 1916 to reach Tank. [1] The line was worked by and finally merged into North Western Railway(NWR.)