Bezwada-Masulipatam Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
mNo edit summary
PEA-2292 (talk | contribs)
Info added - links checked
 
Line 1: Line 1:
{{Line Railways Infobox
|image=
|caption=
|route= [[Bezwada ]] to [[Masulipatam]]
|gauge1= Metre gauge
|gauge1details=  52 miles (1909)
|gauge2= 
|gauge2details=
|gauge3=
|gauge3details=
|gauge4=
|gauge4details=
|timeline1date= 1908 Feb
|timeline1details= [[Bezwada ]] to [[Masulipatam]], 50 miles, section opened
|timeline2date=  1909 Jan
|timeline2details= Extension to [[Masulipatam]] Port,  2 miles, opened
|timeline3date=
|timeline3details=
|timeline4date=
|timeline4details= 
|timeline5date=
|timeline5details= 
|presidency= [[Madras (Presidency)]]
|stations= [[Bezwada ]], [[Masulipatam]],
|system1date=
|system1details= District Board Railway; worked by [[Madras and Southern Mahratta Railway]]               
|system2date=
|system2details=
|system3date=
|system3details= 
}}
'''Bezwada-Masulipatam Railway'''
'''Bezwada-Masulipatam Railway'''


Line 4: Line 36:
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n95/mode/2up  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 87]; Retrieved 30 Jan 2016</ref>
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n95/mode/2up  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 87]; Retrieved 30 Jan 2016</ref>


The line was completed in 1908, worked by M&MSR
The line was completed in 1908, worked by M&MSR. Extended in 1909 to Masulipatam Port (tidal lock in the mouth of the River Krishna on the Bay of Bengal.)


== References ==
== References ==

Latest revision as of 17:48, 20 February 2016

Bezwada-Masulipatam Railway
[[Image:|150px| ]]
Line of route
Bezwada to Masulipatam
Gauge / mileage
Metre gauge 52 miles (1909)
Timeline
1908 Feb Bezwada to Masulipatam, 50 miles, section opened
1909 Jan Extension to Masulipatam Port, 2 miles, opened
Key locations
Presidency Madras (Presidency)
Stations Bezwada , Masulipatam,
System agency
District Board Railway; worked by Madras and Southern Mahratta Railway
How to interpret this infobox

Bezwada-Masulipatam Railway

The Kistna District Board raised funds to construct the branch feeder line from Bezwada to Masulipatam to connect with the Madras and Southern Mahratta Railway(M&SMR). [1]

The line was completed in 1908, worked by M&MSR. Extended in 1909 to Masulipatam Port (tidal lock in the mouth of the River Krishna on the Bay of Bengal.)

References