Faridpur Branch Railway: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
Added info with reference |
||
Line 1: | Line 1: | ||
The '''Faridpur Branch Railway''' was a [[Eastern Bengal Railway]](EBR) branch line. The line opened in 1898-99. | The '''Faridpur Branch Railway''' was a [[Eastern Bengal Railway]](EBR) branch line. The line opened in 1898-99, with a line length of 14 miles(23km) connected to the EBR Eastern Section mainline at Pachooria Junction via Shivarampore to [[Faridpur]]. The broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line opened in 1898-99 | ||
<ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n51/mode/1up “Administration Report on Railways 1918” page 42 (pdf51)]; Retrieved 30 Jan 2019</ref>. | |||
It was a | It was a branch of the [[Poradaha Branch Railway]] that had been constructed by [[Northern Bengal State Railway]](NBSR) but worked by EBR, later apparently taken over by EBR c.1913 | ||
==Further Infortmation== | ==Further Infortmation== | ||
See '''[[Eastern Bengal Railway]]''' | See '''[[Eastern Bengal Railway]]''' | ||
==References== | |||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:State Railways]] | [[Category:State Railways]] |
Revision as of 10:16, 30 January 2019
The Faridpur Branch Railway was a Eastern Bengal Railway(EBR) branch line. The line opened in 1898-99, with a line length of 14 miles(23km) connected to the EBR Eastern Section mainline at Pachooria Junction via Shivarampore to Faridpur. The broad gauge(BG) line opened in 1898-99 [1].
It was a branch of the Poradaha Branch Railway that had been constructed by Northern Bengal State Railway(NBSR) but worked by EBR, later apparently taken over by EBR c.1913
Further Infortmation
References
- ↑ “Administration Report on Railways 1918” page 42 (pdf51); Retrieved 30 Jan 2019