Rendel, Palmer and Tritton Partnership: Difference between revisions
Jump to navigation
Jump to search
Created page with "'''Rendel, Palmer and Tritton Partnership''' formed with Sir Alexander Meadows Rendel , Frederick Palmer and Mr. (later Sir) Seymour Tritton. The firm were appoint..." |
Izat Bridge info added |
||
Line 3: | Line 3: | ||
''The date of formation of this partnership has not been determined'' | ''The date of formation of this partnership has not been determined'' | ||
it is recorded that prior to this partnership the consultancy was named 'Messrs Rendel and Robertson' | |||
<ref name=Dorman>[https://dormanlongtechnology.com/Download_files/DL%20Historical/Dorman%20Long%20bridges%201930%20book.pdf Dorman Long and Co ‘Bridges’ 1930 Edition)]; Retrieved 26 Nov 2020</ref>. | |||
==Projects Undertaken== | ==Projects Undertaken== | ||
The following have been identified as appointed Consulting Engineers | The following have been identified as appointed Consulting Engineers:- | ||
* '[[Reond Khud Bridge]]' assessment of engineering designs. The bridge was completed in 1927 | * '[[Izat Bridge]]', by 'Messrs Rendel and Robertson'. The bridge was completed in 1912 for [[B&NWR]] | ||
* '[[Reond Khud Bridge]]' assessment of engineering designs. The bridge was completed in 1927 for the Indian Government and Indian railways:- | |||
== References == | == References == |
Latest revision as of 11:30, 26 November 2020
Rendel, Palmer and Tritton Partnership formed with Sir Alexander Meadows Rendel , Frederick Palmer and Mr. (later Sir) Seymour Tritton. The firm were appointed Consulting Engineers to the Indian Government and Indian railways. [1].
The date of formation of this partnership has not been determined
it is recorded that prior to this partnership the consultancy was named 'Messrs Rendel and Robertson' [2].
Projects Undertaken
The following have been identified as appointed Consulting Engineers:-
- 'Izat Bridge', by 'Messrs Rendel and Robertson'. The bridge was completed in 1912 for B&NWR
- 'Reond Khud Bridge' assessment of engineering designs. The bridge was completed in 1927 for the Indian Government and Indian railways:-
References
- ↑ Graces Guide "Frederick Palmer"; Retrieved 24 Nov 2020
- ↑ Dorman Long and Co ‘Bridges’ 1930 Edition); Retrieved 26 Nov 2020