Trans Indus (Kalabagh-Bannu) Railway

From FIBIwiki
Revision as of 11:17, 21 December 2015 by PEA-2292 (talk | contribs) (1918 Admin Report details checked/added/corrected)
Jump to navigation Jump to search

The Trans Indus (Kalabagh-Bannu) Railway was a2ft 6in/762mm narrow gauge(NG) line, the first section between Kalabagh and Bannu, 89 miles(142km) opened in 1913. The line was extended by a further 46 miles(73km) in 1916 to reach Tank. [1] The line was worked by and finally merged into North Western Railway(NWR.)

References