Simla Hydroelectric Scheme Construction Monorail

From FIBIwiki
Revision as of 09:35, 18 May 2017 by PEA-2292 (talk | contribs) ('Ewing System Monorail' link added)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Simla Hydroelectric Scheme Construction Monorail

A hydroelectic scheme was built by 'Marsland, Price & Company' on the Nauti Khud Stream, 14 miles(22km) from Simla to provide electricity to Simla. It was constructed between 1908 and 1912 [1].

A Ewing type monorail system must have been used during the construction. In the 6 Jul 1912 edition of 'Indian Engineering' the company advertised a number of Ewing monorail trucks for sale among the surplus material from the project [1]

References

  1. 1.0 1.1 “Industrial Railways and Locomotives of India and South Asia” compiled by Simon Darvill. Published by ‘The Industrial Railway Society’ 2013. ISBN 978 1 901556 82-7. Available at http://irsshop.co.uk/India. Reference: Entry HP04 page 163