Difference between revisions of "Gang Canal Construction Railway"

From FIBIwiki
Jump to navigation Jump to search
(New page all checked)
 
(Kankar link added)
 
Line 1: Line 1:
 
'''Gang Canal Construction Tramways'''
 
'''Gang Canal Construction Tramways'''
  
The 70 mile(112km) long 'Gang Canal' in the Ganganagar District was built as part of the '[[Sutlej Valley Project Railways|Sutlej Valley Project]]' between 1924 and 1928.The canal was lined with concrete and a number of tramways were used during its construction. The kankar for the concrete was obtained from the quarries at Darbari <ref name = DarvRJ10>“Industrial Railways and Locomotives of India and South Asia” compiled by Simon Darvill. Published by ‘The Industrial Railway Society’ 2013. ISBN 978 1 901556 82-7. Available at  http://irsshop.co.uk/India. Reference:  Entry RJ10 page ....</ref>.
+
The 70 mile(112km) long 'Gang Canal' in the Ganganagar District was built as part of the '[[Sutlej Valley Project Railways|Sutlej Valley Project]]' between 1924 and 1928.The canal was lined with concrete and a number of tramways were used during its construction. The [[Kankar]] for the concrete was obtained from the quarries at Darbari <ref name = DarvRJ10>“Industrial Railways and Locomotives of India and South Asia” compiled by Simon Darvill. Published by ‘The Industrial Railway Society’ 2013. ISBN 978 1 901556 82-7. Available at  http://irsshop.co.uk/India. Reference:  Entry RJ10 page ....</ref>.
  
 
*''' Darbari Quarries Tramway'''
 
*''' Darbari Quarries Tramway'''
There were 9 miles(14km) of 2ft/610mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) hand worked tramway at the quarries used to transfer the kankar to the mainline loading site located on the [[Bikaner State Railway]] (BkSR) mainline Lalgarh Junction to Kolayat section. At the loading site the kankar was discharged by gravity into special MG wagons <ref name = DarvRJ10/>
+
There were 9 miles(14km) of 2ft/610mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) hand worked tramway at the quarries used to transfer the kankar to the mainline loading site located on the [[Bikaner State Railway]] (BkSR) mainline Lalgarh Junction to Kolayat section. At the loading site the [[Kankar|Kankar limestone]] was discharged by gravity into special MG wagons <ref name = DarvRJ10/>
  
 
*'''Bikaner Canal Construction Railway'''
 
*'''Bikaner Canal Construction Railway'''
Line 10: Line 10:
  
 
*'''Khai to Gang Canal Tramway'''
 
*'''Khai to Gang Canal Tramway'''
After the kankar was unloaded at Khai it was taken to the screening plant by a 2ft/610mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) tramway. The total of 5 miles(8km) of track linked the screening plant, lime kilns, sand and ballast storage and the concrete plant, all hand worked. A further 2ft/610mm [[Rail_gauge#Narrow_Gauge|NG]] tramway ran from the cement plant to the ‘Gang Canal’ works Khai <ref name = DarvRJ10/>.
+
After the [[Kankar]] was unloaded at Khai it was taken to the screening plant by a 2ft/610mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) tramway. The total of 5 miles(8km) of track linked the screening plant, lime kilns, sand and ballast storage and the concrete plant, all hand worked. A further 2ft/610mm [[Rail_gauge#Narrow_Gauge|NG]] tramway ran from the cement plant to the ‘Gang Canal’ works Khai <ref name = DarvRJ10/>.
  
 
== References ==
 
== References ==

Latest revision as of 07:27, 6 May 2018

Gang Canal Construction Tramways

The 70 mile(112km) long 'Gang Canal' in the Ganganagar District was built as part of the 'Sutlej Valley Project' between 1924 and 1928.The canal was lined with concrete and a number of tramways were used during its construction. The Kankar for the concrete was obtained from the quarries at Darbari [1].

  • Darbari Quarries Tramway

There were 9 miles(14km) of 2ft/610mm narrow gauge(NG) hand worked tramway at the quarries used to transfer the kankar to the mainline loading site located on the Bikaner State Railway (BkSR) mainline Lalgarh Junction to Kolayat section. At the loading site the Kankar limestone was discharged by gravity into special MG wagons [1]

  • Bikaner Canal Construction Railway

From the loading site the MG special wagons were made up into 28 wagon trains and taken on the Bikaner State Railway (BkSR) mainline to Sriganganger (now named Sri Ganganagar [2], a length of 199 miles(318km). Here it connected to a branch line specially built by BkSr and named the ‘Bikaner Canal Construction Railway’, a 89 mile(142km) MG line to Khai [1].

  • Khai to Gang Canal Tramway

After the Kankar was unloaded at Khai it was taken to the screening plant by a 2ft/610mm narrow gauge(NG) tramway. The total of 5 miles(8km) of track linked the screening plant, lime kilns, sand and ballast storage and the concrete plant, all hand worked. A further 2ft/610mm NG tramway ran from the cement plant to the ‘Gang Canal’ works Khai [1].

References

  1. 1.0 1.1 1.2 1.3 “Industrial Railways and Locomotives of India and South Asia” compiled by Simon Darvill. Published by ‘The Industrial Railway Society’ 2013. ISBN 978 1 901556 82-7. Available at http://irsshop.co.uk/India. Reference: Entry RJ10 page ....
  2. Wikipedia “Sri Ganganer” ; Retrieved 25 May 2017