Changes

Jump to navigation Jump to search

Jamshedpur Steel Works Railway

190 bytes added, 16:12, 11 February 2019
Text corrections and links added
==Iron Ore Production==
*'''[[Gorumahisani Iron Mine Railway|Gorumahisani Iron Mine]]''', situated 60 km south of the Jamshedpur Works. Production from the Iron Mine commenced in 1911 <ref>“Industrial Railways and Locomotives of India and South Asia” compiled by Simon Darvill. Published by ‘The Industrial Railway Society’ 2013. ISBN 978 1 901556 82-7. Available at http://irsshop.co.uk/India. Reference: Entry OR54 page ....</ref>.The [[Bengal-Nagpur Railway]](BNR) broad gauge([[Rail_gauge#Broad_Gauge|BG]]) ‘Kalimati [[Kalimati-Gorumahisani Extension Railway’ Railway]]’ from Kalimati (now called Tatanagar JuctionJunction, 5km south of [[Jamshedpur]]) where it connected to the Works Railway. The line was , with a length of 40 miles(64km)in length and opened in 1911. <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n11/mode/1up “Administration Report on Railways 1918” page 2 (pdf11)]; Retrieved 3 May 2017</ref>.At Kalimati there was a connection to the Works BG Railway. [[Kalimati-Gorumahisani Extension Railway | ''See separate pages for more information'']] *'''[[Badampahar Iron Mine Railway|Badampahar Iron Mine]]''', situated 100 km south of the Jamshedpur Works. Production from the Iron Mine commenced in 1922. The [[Bengal-Nagpur Railway]] broad gauge([[Rail_gauge#Broad_Gauge|BG]]) ‘Badampahar Spur’ was constructed as a branch from the BNR 'Kalimati-Gorumahisani Extension Railway' The date of opening of this spur is unknown but probably 1922, the date the mine became operational.[[Badampahar Iron Mine Railway| ''See separate pages for more information'']]
== References ==
9,628
edits

Navigation menu