9,628
edits
Changes
Jump to navigation
Jump to search
New info and links added
The records also show that from 1919 through to 1947 there were 3ft 0in(914mm) locomotives at the works and also a number of 2ft 0in(610mm) [[Rail_gauge#Narrow_Gauge|NG]] locomotives, the route and use unknown <ref name =darvill/>.
==Iron Ore Production==
*'''[[Gorumahisani Iron Mine Railway|Gorumahisani Iron Mine]]''', situated 60 km south of the Jamshedpur Works. Production from the Iron Mine commenced in 1911 <ref>“Industrial Railways and Locomotives of India and South Asia” compiled by Simon Darvill. Published by ‘The Industrial Railway Society’ 2013. ISBN 978 1 901556 82-7. Available at http://irsshop.co.uk/India. Reference: Entry OR54 page ....</ref>.The [[Bengal-Nagpur Railway]](BNR) broad gauge([[Rail_gauge#Broad_Gauge|BG]]) ‘Kalimati-Gorumahisani Extension Railway’ from Kalimati (now called Tatanagar Juction, 5km south of [[Jamshedpur]]) where it connected to the Works Railway. The line was 40 miles(64km)in length and opened in 1911<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n11/mode/1up “Administration Report on Railways 1918” page 2 (pdf11)]; Retrieved 3 May 2017</ref>.
*'''[[Badampahar Iron Mine Railway|Badampahar Iron Mine]]''', situated 100 km south of the Jamshedpur Works. Production from the Iron Mine commenced in 1922. The [[Bengal-Nagpur Railway]] broad gauge([[Rail_gauge#Broad_Gauge|BG]]) ‘Badampahar Spur’ was constructed as a branch from the BNR 'Kalimati-Gorumahisani Extension Railway' The date of opening of this spur is unknown but probably 1922, the date the mine became operational.
== References ==