Difference between revisions of "Mark William Carr"

From FIBIwiki
Jump to navigation Jump to search
(New ‘Railway Person’ page created)
 
m (Link corrected)
 
Line 3: Line 3:
 
==Railway Achievements in India==
 
==Railway Achievements in India==
 
*1858, [[Great Southern of India Railway]](GSIR), Chief Engineer <ref name=grace/>  
 
*1858, [[Great Southern of India Railway]](GSIR), Chief Engineer <ref name=grace/>  
*c.1863, reigned from GSIR was appointed Chief Contractor’s Agent by [[Waring Brothers and Hunt Partnership]], during the construction of the Allahabad and Jubbulpore branch of the [[East Indian Railway]].
+
*c.1863, resigned from GSIR was appointed Chief Contractor’s Agent for [[Waring Brothers ]], during the construction of the Allahabad and Jubbulpore branch of the [[East Indian Railway]].
 
*c.1868, returned to England
 
*c.1868, returned to England
  

Latest revision as of 12:51, 24 June 2016

Mark William Carr (1822-1888)[1].

Railway Achievements in India

References

  1. 1.0 1.1 Grace's Guide "Mark William Carr" Retrieved on 18 Jun 2016