Difference between revisions of "Nagbhir-Nagpur Branch Railway"
Jump to navigation
Jump to search
(Revision to agree with other pages, 'Reference' added) |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
'''Nagbhir-Nagpur Branch Railway''' | '''Nagbhir-Nagpur Branch Railway''' | ||
− | Branch line of BNR( | + | Branch line of the [[Bengal-Nagpur Railway]](BNR) [[Satpura Railway]] 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) network. Construction commenced 1905 and the line opened in 1908. |
− | + | ||
+ | The line opened from [[Nagbhir]] to Itwari , in suburbs of [[Nagpur]], 1908 with later rearrangements at Itwari. Length 68 miles(109km)<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n15/mode/1up “Administration Report on Railways 1918” page 6 (pdf15)]; Retrieved 11 Dec 2016</ref> | ||
+ | |||
+ | ==Further Information== | ||
+ | See '''[[Satpura Railway]]''' | ||
+ | |||
+ | == References == | ||
+ | <references /> | ||
[[Category:Railways]] | [[Category:Railways]] | ||
+ | [[Category:State Railways]] | ||
+ | [[Category:Narrow Gauge (NG) Railways]] |
Latest revision as of 06:24, 13 December 2016
Nagbhir-Nagpur Branch Railway
Branch line of the Bengal-Nagpur Railway(BNR) Satpura Railway 2ft 6in/762mm narrow gauge(NG) network. Construction commenced 1905 and the line opened in 1908.
The line opened from Nagbhir to Itwari , in suburbs of Nagpur, 1908 with later rearrangements at Itwari. Length 68 miles(109km)[1]
Further Information
See Satpura Railway
References
- ↑ “Administration Report on Railways 1918” page 6 (pdf15); Retrieved 11 Dec 2016