Difference between revisions of "Rajpura-Bhatinda Railway"

From FIBIwiki
Jump to navigation Jump to search
(Category changed to State Railway)
(Fully checked; 1918 Admin Report link changed; "Further Information" added with link)
 
Line 4: Line 4:
 
|route= [[Rajpura]] to [[Bhatinda]]
 
|route= [[Rajpura]] to [[Bhatinda]]
 
|gauge1= Broad gauge
 
|gauge1= Broad gauge
|gauge1details= 107 miles (1905)
+
|gauge1details= 108 miles (1905)
 
|gauge2=  
 
|gauge2=  
 
|gauge2details=  
 
|gauge2details=  
Line 32: Line 32:
  
 
Originally named the '''Rajpura-Pattiala Railway''', the '''Rajpura-Bhatinda Railway''' was a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) connecting line between [[Rajpura]], to the north-west of [[Ambala]], and the important junction at [[Bhatinda]] a distance of 108 miles(172km). The first section opened in 1884 and completed in 1889.
 
Originally named the '''Rajpura-Pattiala Railway''', the '''Rajpura-Bhatinda Railway''' was a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) connecting line between [[Rajpura]], to the north-west of [[Ambala]], and the important junction at [[Bhatinda]] a distance of 108 miles(172km). The first section opened in 1884 and completed in 1889.
The railway was worked by North Western Railway(NWR)
+
The railway was worked by [[North Western Railway]](NWR)
<ref>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 117]; Retrieved 20 Dec 2015</ref>
+
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n125/mode/2up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 117]; Retrieved 11 Feb 2016</ref>
 +
 
 +
==Further Information==
 +
See '''[[North Western Railway]]'''
  
 
== References ==
 
== References ==

Latest revision as of 17:07, 11 February 2016

Rajpura-Bhatinda Railway
[[Image:|150px| ]]
Line of route
Rajpura to Bhatinda
Gauge / mileage
Broad gauge 108 miles (1905)
Timeline
Key locations
Presidency Bengal
Stations Dhuri, Nabha, Patiala
System agency
Worked by North Western Railway
How to interpret this infobox

Originally named the Rajpura-Pattiala Railway, the Rajpura-Bhatinda Railway was a broad gauge(BG) connecting line between Rajpura, to the north-west of Ambala, and the important junction at Bhatinda a distance of 108 miles(172km). The first section opened in 1884 and completed in 1889. The railway was worked by North Western Railway(NWR) [1]

Further Information

See North Western Railway

References