Changes

Jump to navigation Jump to search

Bezwada-Madras Railway

18 bytes removed, 06:20, 26 April 2016
m
no edit summary
'''Bezwada-Madras Railway'''
The [[Bezwada]]-[[Madras]] Railway was surveyed in November 1893 by Consulting Engineer [[Francis Joseph Edward Spring, Sir|F J E Spring]].
The 1898 detailed scale drawings of bridges, stations, offices, railway station machinery, temporary buildings, road crossings designs of were made by [[E J Moore]] Engineer-in-Chief of the Bezwada-Madras Railway and [[J C Lyle]] being his Assistant.
<ref>[https://books.google.fr/books?id=3VQTAAAAYAAJ&pg=PA546&lpg=PA546&dq=Bangalore+Harihar+Railway&source=bl&ots=eoKE12owR5&sig=MbPq4iwigkvPzjvei8V9yFNdhRw&hl=fr&sa=X&ved=0CEoQ6AEwBTgoahUKEwigyYWWz_nIAhXKPRQKHSkaDyY#v=onepage&q=Bangalore%20Harihar%20Railway&f=false Google Books - "India and Indian Office List, 1905 - Record of Services" page 546];Retrieved 16 Apr 2016</ref>
9,628
edits

Navigation menu