Changes

Jump to navigation Jump to search

Francis Joseph Edward Spring

338 bytes added, 05:53, 28 April 2016
Railway Acheivements in India: Bridges added under PNSR
<ref>[http://www.gracesguide.co.uk/Francis_Joseph_Edward_Spring "Grace's Guide - Francis Joseph Edward Spring"] Retrieved on 18 Apr 2016</ref>
*1873-1878 '''[[Punjab Northern State Railway]]''' (PNSR) survey and construction of various parts of that Railway railway and a number of complex and on vital bridges to connect [[Lahore]] to [[Peshawar]], 270 miles(430km). **[[Jhelum Bridge]] over the river Jhelum was built in 1873 **[[Alexandra Bridge (River ]] over the river Chenab),is situated between [[Wazirabad]] and [[Gujrat]], completed 1876.**[[Ravi Bridge]] situated between Sadiq Pura, [[Lahore]]and Shahdara Bagh on Ravi river, completed 1876.
*In 1878 promoted to the temporary position of Executive Engineer, which was confirmed in 1880, and had charge of a division of the '''[[Bhavnagar-Gondal-Junagad-Porbandar Railway]]'''.
*1880-84, '''[[Bengal-Nagpur Railway]]''' Survey and the '''[[Benares-Cuttack Railway Survey]]'''
9,628
edits

Navigation menu