Changes

Jump to navigation Jump to search

Darjeeling-Himalayan Extensions Railway

1,384 bytes added, 14:49, 19 August 2020
Full revision with refs and map
[[File:Darjeeling-Himalayan Extensions Railway.png|thumb|Darjeeling-Himalayan Extensions Railway]]
'''Darjeeling-Himalayan Extensions Railway'''
1913 -14 extensions to the [[Darjeeling-Himalayan Railway]](DHR), technically a separate company but worked by (DHR)<ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n249/mode/1up “Administration Report on Railways 1918” page 240 (pdf249)]; Retrieved 19 Aug 2020</ref>.  * ‘Kissengunge Extension’, 66 miles(107km), opened 1914-15, from Panchanai to Kissengunge via Matigara, Naksalbari, Taabpur, Islampur-Aluabari, * ‘Teesia Valley Extension’, 29 miles(47km), opened 1914-15 from Siliguri to Kalimpng Road via Sivoke and Riyang The ‘Statistics of Working’ show the year-by-year financial results for this ‘Extensions Railway’ from 1913-14 through to 1936-37 and open mileage rising from 14¼ miles(23km) reaching 95 miles (154km) from 1915-16 onwards <ref name=Hist1937>[https://ia801605.us.archive.org/30/items/in.ernet.dli.2015.36650/2015.36650.India-Railway-Board-History-Of-Indian-Railways-Constructed-And-In-Progress.pdf US Archive .org pdf download of ‘History Of Indian Railways, constructed and in progress’, 31 March 1937 by ‘The Government of India - Railway Department’ page 227, pdf 270]; Retrieved 19 Aug 2020</ref>. == Classification ==[[Indian Railway Classification]] of 1926 - Class II railway system.
==Further Information==
See '''[[Darjeeling-Himalayan Railway]]'''
 
== References ==
<references />
[[Category:Railways]]
[[Category:Assisted Railways]][[Category:Indian Railways]]
[[Category:Narrow Gauge (NG) Railways]]
9,628
edits

Navigation menu