Changes

Jump to navigation Jump to search

Dildarnagar-Ghazipur-Trighat Branch Railway

436 bytes added, 06:52, 28 August 2020
Further Info and Reference added
This branch with a station at [[Nagsar]] and its terminus at [[Tarighat]] was opened on the south bank of the Ganges,opposite [[Ghazipur]] 12 miles(19 km) from Dildarnagar.
The line was later on 1 Jan 1889 incorporated in the [[East Indian Railway]](EIR) systemto become the 'EIR Tari Ghat Branch' <ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n63/mode/1up “Administration Report on Railways 1918” page 54 (pdf63) ]; Retrieved 27 Aug 2020</ref>.
== External Links ==
==Further Information==
See '''[[East Indian RailwayEast_Indian_Railway_-_Lines_owned_and_worked#Branches_from_the_Howrah-Delhi_EIR_Main_Line|Branches from the Howrah-Delhi EIR Main Line]]''' == References ==<references />
[[Category:Railways]]
[[Category:State Railways]]
9,628
edits

Navigation menu