Difference between revisions of "Sind-Sagar Railway"

From FIBIwiki
Jump to navigation Jump to search
m
(Fully checked; Further Info added with link)
Line 32: Line 32:
  
 
Originally constructed to metre gauge, the '''Sind-Sagar Railway''' was later converted to broad gauge. In 1886 the eastern section of the was amlagamted with other railways to form the [[North-Western State Railway]].
 
Originally constructed to metre gauge, the '''Sind-Sagar Railway''' was later converted to broad gauge. In 1886 the eastern section of the was amlagamted with other railways to form the [[North-Western State Railway]].
 +
 +
==Further Information==
 +
See '''[[North-Western State Railway]]'''
  
 
[[Category:Railways]]
 
[[Category:Railways]]
 
[[Category:State Railways]]
 
[[Category:State Railways]]

Revision as of 07:57, 13 February 2016

Sind-Sagar Railway
[[Image:|150px| ]]
Line of route
Gauge / mileage
Timeline
Key locations
Presidency
Stations
System agency
How to interpret this infobox

Originally constructed to metre gauge, the Sind-Sagar Railway was later converted to broad gauge. In 1886 the eastern section of the was amlagamted with other railways to form the North-Western State Railway.

Further Information

See North-Western State Railway