Difference between revisions of "Umaria Coalfield Railway"

From FIBIwiki
Jump to navigation Jump to search
(Data added, links checked, Work-in-progress removed)
(Fully checked; Further Info added with link)
Line 5: Line 5:
 
The [[Bilaspur-Etawa Provincial State Railway]] was absorbed by the [[Bengal Nagpur Railway]](BNR) on 1st January 1888
 
The [[Bilaspur-Etawa Provincial State Railway]] was absorbed by the [[Bengal Nagpur Railway]](BNR) on 1st January 1888
  
 +
==Further Information==
 +
See '''[[Bengal Nagpur Railway]]'''
  
 
[[Category:Railways]]
 
[[Category:Railways]]
 
[[Category:State Railways]]
 
[[Category:State Railways]]

Revision as of 10:03, 14 February 2016

The Umaria Coalfield Railwayopened in 1886-87 in order to connect Umaria Coalfield to the railway system.

The line was part of Katni-Umaria Provincial State Railway which was a section of the Bilaspur-Etawa Provincial State Railway.

The Bilaspur-Etawa Provincial State Railway was absorbed by the Bengal Nagpur Railway(BNR) on 1st January 1888

Further Information

See Bengal Nagpur Railway