Hoshiarpur Doab Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Records section added with text and source link
PEA-2292 (talk | contribs)
Full rewrite; Systam Infobox added, all links checked
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
The [[Hoshiarpur Doab Railway]] was a private company (The Hoshiarpur-Doab Branch Railway Company), that opened a series of railway lines from 1912 through to 1920. All these lines were worked by [[North Western Railway]](NWR)
{{System_Railways_Infobox
<ref name=name>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 111  ]; Retrieved 18 Dec 2015</ref>
|image=
|caption=
|timeline1date= c.1915
|timeline1details= Hoshiarpur-Doab Branch Railway Company formed
|timeline2date=
|timeline2details=
|timeline3date=
|timeline3details=
|timeline4date=
|timeline4details= 
|timeline5date=
|timeline5details= 
|company1=
|company1details=
|company2=  1915
|company2details= '''Jullundur-Mukerian Railway''' opened
|company3= 1915
|company3details= '''Phagwara-Rahon Railway''' opened
|company4= 1917
|company4details= '''Jaijon Extension Railway''' opened
|company5=
|company5details=
|company6=
|company6details=
|company7=
|company7details=
|company8=
|company8details=
|company9=
|company9details=
|company10=
|company10details=
|company11=
|company11details=
|company12=
|company12details=
|headquarters=
|workshop=
|stations= [[Jullundur]], [[Mukerian]], [[Phagwara]], [[Rahon]], [[Nawashahr]], [[Jaijon]]
|system1date=  1915
|system1details=  Worked by by [[North Western Railway]]
|system2date= later
|system2details= Absorbed into [[North Western Railway]] network
|system3date=
|system3details= 
|gauge1=  Broad gauge
|gauge1details=  90miles (1917)
|gauge2=
|gauge2details=
|gauge3=
|gauge3details=
|gauge4=
|gauge4details=
|auxillary forces= }}
 
The '''Hoshiarpur Doab Railway''' was a private company (The Hoshiarpur-Doab Branch Railway Company), that opened a number  of railway lines between 1915 and 1917. All these lines were worked by [[North Western Railway]](NWR) and were  integrated into the NWR network.
<ref name=name>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n119/mode/2up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 111  ]; Retrieved 27 Feb 2016</ref>
<ref>[http://www.forgottenbooks.com/readbook_text/Bengal_and_Assam_Behar_and_Orissa_1000568138/205 Forgotten Books "Bengal and Assam, Behar and Orissa: Their History" ... p.204-5.]; Retrieved 11 Dec 2015</ref>
<ref>[http://www.forgottenbooks.com/readbook_text/Bengal_and_Assam_Behar_and_Orissa_1000568138/205 Forgotten Books "Bengal and Assam, Behar and Orissa: Their History" ... p.204-5.]; Retrieved 11 Dec 2015</ref>
 
* '''Jullundur-Mukerian Railway''', broad gauge([[Rail_gauge_#Broad_Gauge|BG]]), between Jullundur and Mukerian,  44 miles (70km), opened 1915. Construction by the Hoshiarpur Doab Branch Railway Company; worked by NWR<ref name=name/>.
* '''Jullundur-Doab Railway''', opened 1912. Apparently this railway could have originally been been part of Southern Punjab Railway(SPR) and then renamed to form the Hoshiarpur Doab Railway
* '''Phagwara-Rahon Railway''', broad gauge([[Rail_gauge_#Broad_Gauge|BG]]),  between Phagwara and Rahon,  25 miles (40km), opened 1915. Construction by the Hoshiarpur Doab Branch Railway Company; worked by NWR<ref name=name/>.
* '''Jullundur-Mukerian Railway''', metre gauge([[Rail_gauge_#Metre_Gauge|MG]]), 44 miles (70km), opened 1914-15. Part of Jullundur-Doab Railway; which  was renamed Hoshiarpur Doab Railway<ref name=name/>
* '''Jaijon Extension Railway''', broad gauge([[Rail_gauge_#Broad_Gauge|BG]]),  between Nawashahr and Jaijon; 19 miles,  opened 1917. Construction by the Hoshiarpur Doab Branch Railway Company; worked by NWR<ref name=name/>.
* '''Jullundur-Nakodar Chord Railway''', opened after 1914. Part of Jullundur-Doab Railway);  renamed Hoshiarpur Doab Railway
* '''Phagwara-Rahoa(Rahon) Railway''',metre gauge([[Rail_gauge_#Metre_Gauge|MG]]),  25 miles (40km), opened 1915-16 as part of Hoshiarpur Doab Railwayand extended in 1917 by a further 10 miles (16km).<ref name=name/>
The lines were all worked and apparently finally absorbed by [[North Western Railway]](NWR) BG network
* '''Jaijon Extension Railway''', opened before 1920 as part of Hoshiarpur Doab Railway  
 
The network of lines were all worked and apparently finally absorbed by [[North Western Railway]](NWR)
 
 
''Very little information has been found – any contributions gratefully received.''


==Records==
==Records==
Line 22: Line 72:
*'''L /F/8/19/1427 '''  “Hoshiarpur Doab Branch Railways Company Limited, Indenture between the parties; 1917
*'''L /F/8/19/1427 '''  “Hoshiarpur Doab Branch Railways Company Limited, Indenture between the parties; 1917
*'''L/F/8/20/1658 '''  “Hoshiarpur Doab Branch Railway Company Limited, Indenture supplemental to indenture dated 21st February 1917; 1922
*'''L/F/8/20/1658 '''  “Hoshiarpur Doab Branch Railway Company Limited, Indenture supplemental to indenture dated 21st February 1917; 1922
*'''L/AG/46/34/1 '''  “Copies of agreements with the Secretary of State, including those relating to the following lines worked by the Company, 1893-1924: Larkana-Jacobabad (Sind) Light Railway; Sialkot-Narowal Railway; Upper Sind Light Railway; Hoshiarpur Doab Branch Railways; 1893-1924” ''Note – this may include above.''
*'''L/AG/46/34/1 '''  “Copies of agreements with the Secretary of State, including those relating to the following lines worked by the Company, 1893-1924: Larkana-Jacobabad (Sind) Light Railway; Sialkot-Narowal Railway; Upper Sind Light Railway; Hoshiarpur Doab Branch Railways; 1893-1924”  
 
==Further Information==
See '''[[North Western Railway]]'''


== References ==
== References ==

Latest revision as of 06:45, 27 February 2016

Hoshiarpur Doab Railway
[[Image:|150px| ]]
System timeline
c.1915 Hoshiarpur-Doab Branch Railway Company formed
Constituent companies / lines
1915 Jullundur-Mukerian Railway opened
1915 Phagwara-Rahon Railway opened
1917 Jaijon Extension Railway opened
Key locations
Headquarters
Workshops
Major Stations Jullundur, Mukerian, Phagwara, Rahon, Nawashahr, Jaijon
Successor system / organisation
1915 Worked by by North Western Railway
later Absorbed into North Western Railway network
System mileage
Broad gauge 90miles (1917)
Associated auxiliary force
How to interpret this infobox

The Hoshiarpur Doab Railway was a private company (The Hoshiarpur-Doab Branch Railway Company), that opened a number of railway lines between 1915 and 1917. All these lines were worked by North Western Railway(NWR) and were integrated into the NWR network. [1] [2]

  • Jullundur-Mukerian Railway, broad gauge(BG), between Jullundur and Mukerian, 44 miles (70km), opened 1915. Construction by the Hoshiarpur Doab Branch Railway Company; worked by NWR[1].
  • Phagwara-Rahon Railway, broad gauge(BG), between Phagwara and Rahon, 25 miles (40km), opened 1915. Construction by the Hoshiarpur Doab Branch Railway Company; worked by NWR[1].
  • Jaijon Extension Railway, broad gauge(BG), between Nawashahr and Jaijon; 19 miles, opened 1917. Construction by the Hoshiarpur Doab Branch Railway Company; worked by NWR[1].

The lines were all worked and apparently finally absorbed by North Western Railway(NWR) BG network

Records

Refer to FIBIS Fact File #4: “Research sources for Indian Railways, 1845-1947” - available from the Fibis shop. This Fact File contains invaluable advice on 'Researching ancestors in the UK records of Indian Railways' with particular reference to the India Office Records (IOR) held at the British Library

An on-line search of the IOR records relating to this railway [3] gives the following: -

  • L /F/8/19/1427 “Hoshiarpur Doab Branch Railways Company Limited, Indenture between the parties; 1917
  • L/F/8/20/1658 “Hoshiarpur Doab Branch Railway Company Limited, Indenture supplemental to indenture dated 21st February 1917; 1922
  • L/AG/46/34/1 “Copies of agreements with the Secretary of State, including those relating to the following lines worked by the Company, 1893-1924: Larkana-Jacobabad (Sind) Light Railway; Sialkot-Narowal Railway; Upper Sind Light Railway; Hoshiarpur Doab Branch Railways; 1893-1924”

Further Information

See North Western Railway

References