Cawnpore Farukhabad Provincial State Railway: Difference between revisions
Created page with "The ''' Cawnpore Farukhabad Provincial State Railway ''' was owned by the Provincial Government and was worked by the Rajputana Railway to 31st December 1881 and by the Rajput..." |
m Spelling of town name 'Farrukhabad' to conform with Imperial Gazetteer spelling |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Line Railways Infobox | |||
|image= | |||
|caption= | |||
|route= [[Cawnpore]] to [[Farrukhabad]] | |||
|gauge1= Metre gauge | |||
|gauge1details= 86 miles (1881) | |||
|gauge2= | |||
|gauge2details= | |||
|gauge3= | |||
|gauge3details= | |||
|gauge4= | |||
|gauge4details= | |||
|timeline1date= 1880 Dec | |||
|timeline1details= [[Cawnpore]] to [[Miranserai]] section opened | |||
|timeline2date= 1881 Feb | |||
|timeline2details= [[Miranserai]] to [[Farrukhabad]] section opened | |||
|timeline3date= 1884 Jul | |||
|timeline3details= Merged to form the [[Cawnpore-Achnera Provincial State Railway]] | |||
|timeline4date= | |||
|timeline4details= | |||
|timeline5date= | |||
|timeline5details= | |||
|presidency= [[Bombay (Presidency)|Bombay]] | |||
|stations= [[Cawnpore]], [[Miranserai]], [[Farrukhabad]] | |||
|system1date= 1880/1 | |||
|system1details= Worked by [[Rajputana-Malwa Railway]]. | |||
|system2date= 1886 | |||
|system2details= Absorbed into [[Rajputana-Malwa Railway]] and worked by GoI | |||
|system3date= 1907 | |||
|system3details= Absorbed into BB&CIR | |||
}} | |||
The ''' Cawnpore Farukhabad Provincial State Railway ''' was owned by the Provincial Government and was worked by the Rajputana Railway to 31st December 1881 and by the Rajputana-Malwa Railway from 1st December 1882. | The ''' Cawnpore Farukhabad Provincial State Railway ''' was owned by the Provincial Government and was worked by the Rajputana Railway to 31st December 1881 and by the Rajputana-Malwa Railway from 1st December 1882. | ||
The line from [[ | |||
The metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) line from [[Farrukhabad]] to Miranserai (37 miles/59km) opened 1 February 1881 and Miranserai to [[Cawnpore]] (49 miles/78km) opened 15 December 1880 | |||
<ref>[https://indianrailwaynotes.files.wordpress.com/2010/07/north-eastern-railway.pdf "Indian Railway Line History" pages 9 and 11 by Keith Scholey]; Retrieved 10 Dec 2015</ref> | |||
The Cawnpore Farukhabad Provincial State Railway merged with the [[Muttra Achnera Provincial State Railway]] and [[Muttra Hathras Provincial Railway]] to form the [[Cawnpore-Achnera Provincial State Railway]] on 1st July 1884 | The Cawnpore Farukhabad Provincial State Railway merged with the [[Muttra Achnera Provincial State Railway]] and [[Muttra Hathras Provincial Railway]] to form the [[Cawnpore-Achnera Provincial State Railway]] on 1st July 1884 | ||
Line 10: | Line 44: | ||
The Rajputana-Malwa Railway was absorbed by the [[Bombay, Baroda and Central India Railway]](BB&CIR) on 8th April 1907. | The Rajputana-Malwa Railway was absorbed by the [[Bombay, Baroda and Central India Railway]](BB&CIR) on 8th April 1907. | ||
== | == References == | ||
<references /> | |||
[[Category:Railways]] | |||
[[Category:State Railways]] |
Latest revision as of 05:33, 6 April 2016
Cawnpore Farukhabad Provincial State Railway | ||
---|---|---|
[[Image:|150px| ]] | ||
Line of route | ||
Cawnpore to Farrukhabad | ||
Gauge / mileage | ||
Metre gauge | 86 miles (1881) | |
Timeline | ||
1880 Dec | Cawnpore to Miranserai section opened | |
1881 Feb | Miranserai to Farrukhabad section opened | |
1884 Jul | Merged to form the Cawnpore-Achnera Provincial State Railway | |
Key locations | ||
Presidency | Bombay | |
Stations | Cawnpore, Miranserai, Farrukhabad | |
System agency | ||
1880/1 | Worked by Rajputana-Malwa Railway. | |
1886 | Absorbed into Rajputana-Malwa Railway and worked by GoI | |
1907 | Absorbed into BB&CIR | |
How to interpret this infobox |
The Cawnpore Farukhabad Provincial State Railway was owned by the Provincial Government and was worked by the Rajputana Railway to 31st December 1881 and by the Rajputana-Malwa Railway from 1st December 1882.
The metre gauge(MG) line from Farrukhabad to Miranserai (37 miles/59km) opened 1 February 1881 and Miranserai to Cawnpore (49 miles/78km) opened 15 December 1880 [1]
The Cawnpore Farukhabad Provincial State Railway merged with the Muttra Achnera Provincial State Railway and Muttra Hathras Provincial Railway to form the Cawnpore-Achnera Provincial State Railway on 1st July 1884
The Cawnpore-Achnera Provincial State Railway was owned by the Provincial Government and worked by the Rajputana-Malwa Railway.
The Cawnpore- Achnera Provincial State Railway was absorbed by the Rajputana-Malwa Railway on 1st October 1886. The Rajputana-Malwa Railway was owned by the Government of India(GoI) and was worked by the GoI from formation until 31st December 1905 and by the Bombay, Baroda and Central India Railway(BB&CIR) from 1st January 1906.
The Rajputana-Malwa Railway was absorbed by the Bombay, Baroda and Central India Railway(BB&CIR) on 8th April 1907.
References
- ↑ "Indian Railway Line History" pages 9 and 11 by Keith Scholey; Retrieved 10 Dec 2015