Godhra-Baroda Chord Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
New page all checked
 
PEA-2292 (talk | contribs)
m 'Operated...' info added
 
Line 2: Line 2:


Broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line opened 1908, 43 miles(68km) from [[Godhra]] to [[Baroda]] <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n22/mode/1up “Administration Report on Railways 1918” Page 13 (pdf 22) ]; Retrieved  4 Nov 2016</ref>.  
Broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line opened 1908, 43 miles(68km) from [[Godhra]] to [[Baroda]] <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n22/mode/1up “Administration Report on Railways 1918” Page 13 (pdf 22) ]; Retrieved  4 Nov 2016</ref>.  
Operated as part of the [[Bombay, Baroda and Central India Railway]] [[Bombay-Ahmadabad BB&CIR Main Line]]


==Further Information==
==Further Information==

Latest revision as of 16:49, 5 November 2016

Godhra-Baroda Chord Railway

Broad gauge(BG) line opened 1908, 43 miles(68km) from Godhra to Baroda [1].

Operated as part of the Bombay, Baroda and Central India Railway Bombay-Ahmadabad BB&CIR Main Line

Further Information

See Bombay, Baroda & Central India Railway Network - Lines owned and worked

References