Umaria Coalfield Railway: Difference between revisions
mNo edit summary |
New info added, links checked. |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
'''Umaria | The '''Umaria Colliery''' opened in 1883-84 and initially operated by [[Central Provinces|Central Provinces Government]] until 1897 when taken over by Rewah State (A [[Princely states|Pricely State]] of the | ||
[[Central India|Central India Agency]] <ref name =darvill>“Industrial Railways and Locomotives of India and South Asia” compiled by Simon Darvill. Published by ‘The Industrial Railway Society’ 2013. ISBN 978 1 901556 82-7. Available at http://irsshop.co.uk/India. Reference: Entry MP46 page ....</ref>. | |||
'''Umaria Coalfield Railway''', a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line was a opened in 1886-87 and was accorded priority in construction in order to connect Umaria Coalfield to the railway system at [[Katni]] <ref>[https://en.wikipedia.org/wiki/Umaria_Coalfield Wikipedia "Umaria Coalfield"]; Retrieved 11 Mar 2017</ref> . The line was part of [[Katni-Umaria Provincial State Railway]] which was a section of the [[Bilaspur-Etawa Provincial State Railway]]. The [[Bilaspur-Etawa Provincial State Railway]] was absorbed by the [[Bengal Nagpur Railway]](BNR) on 1st January 1888. | |||
<br> [[Katni]] was a major transport hub with broad gauge([[Rail_gauge#Broad_Gauge|BG]]) lines via the [[East Indian Railway]](EIR) to north to Allahabad; south to Jubblepore and westward by the [[Great Indian Peninsula Railway]](GIPR). Thus Umaria Coal could be distributed across the country. | |||
'''Umaria Coalfield Tramways''' a ¼ mile(400 metre) section of tramway of unknown gauge was supplied in 1889 and by 1897 a scheme was proposed for the development of the colliery in which it was decided to expand the areas underground where tramways were laid and to purchase 500 coal bubs for three areas of the mines <ref name =darvill/>. No further information has been found | |||
== References == | |||
<references /> | |||
==Further Information== | |||
See '''[[Bengal Nagpur Railway]]''' | |||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:State Railways]] | [[Category:State Railways]] | ||
[[Category:Industrial Railways]] | |||
[[Category:Tramways]] |
Latest revision as of 07:48, 11 March 2017
The Umaria Colliery opened in 1883-84 and initially operated by Central Provinces Government until 1897 when taken over by Rewah State (A Pricely State of the Central India Agency [1].
Umaria Coalfield Railway, a broad gauge(BG) line was a opened in 1886-87 and was accorded priority in construction in order to connect Umaria Coalfield to the railway system at Katni [2] . The line was part of Katni-Umaria Provincial State Railway which was a section of the Bilaspur-Etawa Provincial State Railway. The Bilaspur-Etawa Provincial State Railway was absorbed by the Bengal Nagpur Railway(BNR) on 1st January 1888.
Katni was a major transport hub with broad gauge(BG) lines via the East Indian Railway(EIR) to north to Allahabad; south to Jubblepore and westward by the Great Indian Peninsula Railway(GIPR). Thus Umaria Coal could be distributed across the country.
Umaria Coalfield Tramways a ¼ mile(400 metre) section of tramway of unknown gauge was supplied in 1889 and by 1897 a scheme was proposed for the development of the colliery in which it was decided to expand the areas underground where tramways were laid and to purchase 500 coal bubs for three areas of the mines [1]. No further information has been found
References
- ↑ 1.0 1.1 “Industrial Railways and Locomotives of India and South Asia” compiled by Simon Darvill. Published by ‘The Industrial Railway Society’ 2013. ISBN 978 1 901556 82-7. Available at http://irsshop.co.uk/India. Reference: Entry MP46 page ....
- ↑ Wikipedia "Umaria Coalfield"; Retrieved 11 Mar 2017