Sirhind-Rupar Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
No edit summary
PEA-2292 (talk | contribs)
Fully checked; Further Info added with link; IRFCA Reference text changed.
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
'''Sirhind-Rupar Railway'''
The [[Sirhind-Rupar Railway]] was constructed by the [[North Western Railway]](NWR) as part of its network. The line opened in 1927-28.
<ref>[http://dspace.gipe.ac.in/xmlui/bitstream/handle/10973/36874/GIPE-069832-Contents.pdf?sequence=2&isAllowed=y "Punjab District Gazetteer; Ambla District 1936" – Vol 5 , Part B,  Preface iii; pdf page 5]; Retrieved 13 Dec 2015</ref>


Constructed by NWR(qv) and in operation before 1927
The opening of the line  made the [[Patiala State Monorail Trainways]] obsolete together with any plan to extend the line from Rupar to Morinda.
<ref>[http://www.irfca.org/articles/patiala-monorail-reappraisal.html "Patiala Monorail Reappraisal - Sirhind to Morinda Line" by Simon Darvill, 2012. Reproduced by IRFCA ''Indian Railways Fan Club'']; Retrieved 13 Feb 20165</ref>


{{Work-in-Progress-Rly}}
==Further Information==
See '''[[North Western Railway]]'''
 
== References ==
<references />


[[Category:Railways]]
[[Category:Railways]]
[[Category:State Railways]]

Latest revision as of 11:13, 13 February 2016

The Sirhind-Rupar Railway was constructed by the North Western Railway(NWR) as part of its network. The line opened in 1927-28. [1]

The opening of the line made the Patiala State Monorail Trainways obsolete together with any plan to extend the line from Rupar to Morinda. [2]

Further Information

See North Western Railway

References