Nushki Extension Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Data added, links checked, Work-in-progress removed
PEA-2292 (talk | contribs)
Page re-writen with 'Reference' and 'Internal Link'
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
The '''Nushki Extension Railway''' was the extension of [[Trans-Baluchistan Railway]]; construction commenced 1916; worked by [[North Western Railway]](NWR)
The '''Nushki Extension Railway''' was an extension from the [[Quetta-Nushki Branch Line]] which had reached [[Nushki]] on November 15, 1905 and worked as part of the [[North Western Railway]] (NWR) Military Section <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n116/mode/1up Administration Report on Railways 1918” page 98 (pdf107)]; Retrieved  1 Dec 2016</ref>.


The line was extended from 1916 to respond to Military demands – see  '''[[Trans-Baluchistan Railway]]''' for details
== References ==
<references />


[[Category:Railways]]
[[Category:Railways]]
[[Category:State Railways]]
[[Category:State Railways]]

Latest revision as of 14:51, 3 December 2016

The Nushki Extension Railway was an extension from the Quetta-Nushki Branch Line which had reached Nushki on November 15, 1905 and worked as part of the North Western Railway (NWR) Military Section [1].

The line was extended from 1916 to respond to Military demands – see Trans-Baluchistan Railway for details

References