Cawnpore-Banda Railway: Difference between revisions
Infobox added; 'Further Information' added; minor text changes |
'Stations' and internal link added |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
|image= | |image= | ||
|caption= | |caption= | ||
|route= [[Juhi]] to | |route= [[Cawnpore|Cawnpore (Juhi/Govindpur Junction)]] | ||
to Khairar Junction (Khirada) | |||
|gauge1= Broad gauge | |gauge1= Broad gauge | ||
|gauge1details= 73 miles (1914) | |gauge1details= 73 miles (1914) | ||
Line 12: | Line 14: | ||
|gauge4details= | |gauge4details= | ||
|timeline1date= 1913 Apr | |timeline1date= 1913 Apr | ||
|timeline1details= | |timeline1details= Juhi to Hamirpur Road section opened | ||
|timeline2date= 1914 Jul | |timeline2date= 1914 Jul | ||
|timeline2details= Hamirpur Road to | |timeline2details= Hamirpur Road to Khirada opened | ||
|timeline3date= | |timeline3date= | ||
|timeline3details= | |timeline3details= | ||
Line 22: | Line 24: | ||
|timeline5details= | |timeline5details= | ||
|presidency= [[Bombay (Presidency)|Bombay]] | |presidency= [[Bombay (Presidency)|Bombay]] | ||
|stations= | |stations= '''[[Cawnpore]] ''' | ||
''See also separate page'' [[Cawnpore Railways and Stations| ''' Cawnpore Stations''']] ''for details'' | |||
|system1date= 1913 | |system1date= 1913 | ||
|system1details= Worked by [[Oudh and Rohilkhand Railway]] | |system1details= Worked by [[Oudh and Rohilkhand Railway]] | ||
Line 30: | Line 33: | ||
|system3details= | |system3details= | ||
}} | }} | ||
The '''Cawnpore-Banda Railway''' was a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line. The line from [[Juhi]] opened in 1913 and reached | |||
[[File: Cawnpore-Banda Railway.png|thumb| Cawnpore-Banda Railway]] | |||
The '''Cawnpore-Banda Railway''' was a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line. The line from [[Cawnpore|Cawnpore (Juhi / Govindpur Junction)]] opened in 1913 and reached Khairar Junction (Khirada) in 1914, a distance of 73 miles(116km). Khairir Junction is where the line joined the [[Great Indian Peninsula Railway]](GIPR) 5 miles(8km) from [[Banda]]. | |||
The Cawnpore-Banda Railway was constructed and worked as a State line by the [[Oudh and Rohilkhand Railway]](O&RR) up to the 31 March 1915. Thereafter the maintenance, management and working of the line was taken over by [[Great Indian Peninsula Railway]](GIPR) | The Cawnpore-Banda Railway was constructed and worked as a State line by the [[Oudh and Rohilkhand Railway]](O&RR) up to the 31 March 1915. Thereafter the maintenance, management and working of the line was taken over by [[Great Indian Peninsula Railway]](GIPR) | ||
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/ | <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n85/mode/1up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 76]; Retrieved 10 Nov 2018</ref>. | ||
==Records== | ==Records== |
Latest revision as of 10:14, 5 April 2021
Cawnpore-Banda Railway | ||
---|---|---|
[[Image:|150px| ]] | ||
Line of route | ||
Cawnpore (Juhi/Govindpur Junction)
to Khairar Junction (Khirada) | ||
Gauge / mileage | ||
Broad gauge | 73 miles (1914) | |
Timeline | ||
1913 Apr | Juhi to Hamirpur Road section opened | |
1914 Jul | Hamirpur Road to Khirada opened | |
Key locations | ||
Presidency | Bombay | |
Stations | Cawnpore
See also separate page Cawnpore Stations for details | |
System agency | ||
1913 | Worked by Oudh and Rohilkhand Railway | |
1915 Apr | Worked by Great Indian Peninsula Railway | |
How to interpret this infobox |
The Cawnpore-Banda Railway was a broad gauge(BG) line. The line from Cawnpore (Juhi / Govindpur Junction) opened in 1913 and reached Khairar Junction (Khirada) in 1914, a distance of 73 miles(116km). Khairir Junction is where the line joined the Great Indian Peninsula Railway(GIPR) 5 miles(8km) from Banda.
The Cawnpore-Banda Railway was constructed and worked as a State line by the Oudh and Rohilkhand Railway(O&RR) up to the 31 March 1915. Thereafter the maintenance, management and working of the line was taken over by Great Indian Peninsula Railway(GIPR) [1].
Records
Refer to FIBIS Fact File #4: “Research sources for Indian Railways, 1845-1947” - available from the Fibis shop. This Fact File contains invaluable advice on 'Researching ancestors in the UK records of Indian Railways' with particular reference to the India Office Records (IOR) held at the British Library
An on-line search of the IOR records relating to this railway [2] gives the following: -
- L/F/8/17/1353 “Great Indian Peninsula Railway Company, Contract for working the Cawnpore-Banda Railway”
This railway was worked by a State Railway and the following IOR records relating to Staff employment are held :-
- L/F/8/1-20 "Appointments to State Railways made in the UK; 1855-1946"
- Z/L/F/8/1-2 "Index to Appointments to State Railways made in the UK; 1855-1946"
Further Information
See Oudh and Rohilkhand Railway up to 1915, then Great Indian Peninsula Railway