Chenab Bridge, Shershar: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
mNo edit summary
PEA-2292 (talk | contribs)
No edit summary
 
(One intermediate revision by the same user not shown)
Line 7: Line 7:
and completed c.1890 <ref>[https://books.google.co.uk/books?id=gOtAAAAAIAAJ  Google Books “Couplings to the Khyber: the story of the North Western Railway by P. S. A. Berridge,  1969; pages 231 and 266 ] Retrieved on 20 May 2016</ref>.
and completed c.1890 <ref>[https://books.google.co.uk/books?id=gOtAAAAAIAAJ  Google Books “Couplings to the Khyber: the story of the North Western Railway by P. S. A. Berridge,  1969; pages 231 and 266 ] Retrieved on 20 May 2016</ref>.


The construction required special civil engineering techniques developed by [[James Richard Bell]] of the  [[Public Works Department]] <ref>[https://archive.org/stream/scientific-american-1908-09-26/scientific-american-v99-n13-1908-09-26_djvu.txt Archive.org  Scientific AmericanVol 99, Number 13, September 1908  “The narrowing of the Ganges and construction of the Curzon Bridge” , 1908] Retrieved on 20 May 2016</ref>.
The construction required special civil engineering techniques developed by [[James Richard Bell]] of the  [[Public Works Department]] <ref>[https://ia600803.us.archive.org/11/items/scientific-american-1908-09-26/scientific-american-v99-n13-1908-09-26.pdf Archive.org  Scientific American Vol 99, Number 13, September 1908  “The narrowing of the Ganges and construction of the Curzon Bridge” , 1908, page 204, pdf page 4 of 16] Retrieved on 15 Jul 2016</ref>.


The Executive Engineer in 1887 on the project was [[Robert Trefusis Mallet]].
The Executive Engineer in 1887 on the project was [[Robert Trefusis Mallet]].
Line 15: Line 15:
<references />
<references />


[[Category:Railways]]
[[Category:Railways]]
[[Category:Railway Constructions]]
[[Category:Railway Constructions]]

Latest revision as of 14:34, 3 May 2018