Chambal Rail Bridge: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
BL info added with reference following Steve Moore's IOR research
PEA-2292 (talk | contribs)
No edit summary
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
The  '''Chambal Rail Bridge''' formed  part of the broad gauge([[Rail_gauge#Broad_Gauge|BG]]) [[Sindia State Railway]] system linking [[Gwalior]] to [[Agra]] which opened in 1881.  
The  '''Chambal Rail Bridge''' formed  part of the broad gauge([[Rail_gauge#Broad_Gauge|BG]]) [[Sindia State Railway]] system linking [[Gwalior]] to [[Agra]] which opened in 1881.  


A quarry line was opened at Dholpur [[Dholpur Quarry Railway]] to quarry the stone for the ‘Chambal River Bridge’ and  [[Glover & Co|Messrs Glover and Company|]]  were appointed as contractors for the construction  in February 1876  They undertook to complete the line to Dholpur by the end of June 1878 and the complete line by the end October 1880 <ref>[British Library ‘India Office Records’  V/24/3590 “Sindia State Railway Administration Report” 1878-79</ref>.
[[File:Sindia State Railway 1.png|right|400px|'''Chambal Rail Bridge''']]
A quarry line was opened at Dholpur [[Dholpur Quarry Railway]] to quarry the red sandstone for the ‘Chambal River Bridge’ and  [[Glover & Co|Messrs Glover and Company|]]  were appointed as contractors for the construction  in February 1876  They undertook to complete the line to Dholpur by the end of June 1878 and the complete line by the end October 1880 <ref>British Library ‘India Office Records’  V/24/3590 “Sindia State Railway Administration Report” 1878-79</ref>.


The single track bridge opened on 15 May 1881 completing the ‘Hetampur-Dholpu’ section linking [[Gwalior]] to [[Agra]]; the ‘Gwalior–Hetampur’ section having opened in Dec 1879 and the ‘Dholpur-Agra’ section in Jan 1879 <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n73/mode/1up “Administration Report on Railways 1918” page 65 (pdf73) ]; Retrieved  27 Jan 2018</ref>.
The single track bridge opened on 15 May 1881 completing the ‘Hetampur-Dholpu’ section linking [[Gwalior]] to [[Agra]]; the ‘Gwalior–Hetampur’ section having opened in Dec 1879 and the ‘Dholpur-Agra’ section in Jan 1879 <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n73/mode/1up “Administration Report on Railways 1918” page 65 (pdf73) ]; Retrieved  27 Jan 2018</ref>.


The [[Sindia State Railway]] was from 1885 worked by the [[Indian Midland Railway]], which had a comparatively brief existence before being amalgamated in 1900 with the [[Great Indian Peninsula Railway]](GIPR). This Gwalior-Agra line became part of the GIPR ‘Midland Section Mainline’ between [[Bhopal]] and [[Agra]]
The [[Sindia State Railway]]was from 1885 worked by the [[Indian Midland Railway]], which had a comparatively brief existence before being amalgamated in 1900 with the [[Great Indian Peninsula Railway]](GIPR). This Gwalior-Agra line became part of the GIPR ‘Midland Section Mainline’ between [[Bhopal]] and [[Agra]]


The ‘Chambal Rail Bridge’ bridge is still in use today, a second bridge has been constructed adjacent to the original bridge. These bridges can be clearly seen in the photograph showing the original bridge on brick piers in the foreground with the modern bridge behind <ref>[http://www.panoramio.com/photo/61007717 Photograph from Panoramio “Railway Bridges on Chambal River, on Agra-Gwalior track”]; Retrieved  27 Jan 2018</ref>.
The ‘Chambal Rail Bridge’ bridge is still in use today, a second bridge has been constructed adjacent to the original bridge. These bridges can be clearly seen in the photograph showing the original bridge on brick piers in the foreground with the modern bridge behind <ref>[http://www.panoramio.com/photo/61007717 Photograph from Panoramio “Railway Bridges on Chambal River, on Agra-Gwalior track”]; Retrieved  27 Jan 2018</ref>.
Line 14: Line 15:
==Further Information==
==Further Information==
See '''[[Sindia State Railway]]''' for period up to 1885
See '''[[Sindia State Railway]]''' for period up to 1885
 
<br>then '''[[Indian Midland Railway]] ''' 1885-90
then '''[[Sindia State Railway]] ''' 1885-90
<br>and  '''[[Great Indian Peninsula Railway]]''' thereafter.
 
and  '''[[Great Indian Peninsula Railway]]''' thereafter.


== References ==
== References ==

Latest revision as of 10:24, 29 November 2020

The Chambal Rail Bridge formed part of the broad gauge(BG) Sindia State Railway system linking Gwalior to Agra which opened in 1881.

Chambal Rail Bridge
Chambal Rail Bridge

A quarry line was opened at Dholpur Dholpur Quarry Railway to quarry the red sandstone for the ‘Chambal River Bridge’ and Messrs Glover and Company| were appointed as contractors for the construction in February 1876 They undertook to complete the line to Dholpur by the end of June 1878 and the complete line by the end October 1880 [1].

The single track bridge opened on 15 May 1881 completing the ‘Hetampur-Dholpu’ section linking Gwalior to Agra; the ‘Gwalior–Hetampur’ section having opened in Dec 1879 and the ‘Dholpur-Agra’ section in Jan 1879 [2].

The ‘Sindia State Railway’ was from 1885 worked by the ‘Indian Midland Railway’, which had a comparatively brief existence before being amalgamated in 1900 with the ‘Great Indian Peninsula Railway’(GIPR). This Gwalior-Agra line became part of the GIPR ‘Midland Section Mainline’ between Bhopal and Agra

The ‘Chambal Rail Bridge’ bridge is still in use today, a second bridge has been constructed adjacent to the original bridge. These bridges can be clearly seen in the photograph showing the original bridge on brick piers in the foreground with the modern bridge behind [3].

Construction

An 1878-79 report states that the Chambal bridge 'will be one of the most remarkable railway structures in India. It will consist of 12 spans of 200 feet centre to centre of piers, flanked at each end by two land-spans of 150 feet. The piers will be 108 feet high above low water level to underside of girder bed. The total length of the bridge over abutments will be 2,714 feet, or rather over half a mile, and the greatest height of bridge 145 feet.' [4].

Further Information

See Sindia State Railway for period up to 1885
then Indian Midland Railway 1885-90
and Great Indian Peninsula Railway thereafter.

References

  1. British Library ‘India Office Records’ V/24/3590 “Sindia State Railway Administration Report” 1878-79
  2. “Administration Report on Railways 1918” page 65 (pdf73) ; Retrieved 27 Jan 2018
  3. Photograph from Panoramio “Railway Bridges on Chambal River, on Agra-Gwalior track”; Retrieved 27 Jan 2018
  4. British Library ‘India Office Records’ V/24/3590 “Sindia State Railway Administration Report” 1878-79