Hajiganj-Shatnal Railway Survey: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
mNo edit summary
PEA-2292 (talk | contribs)
References format corrected
Line 2: Line 2:


The branch was surveyed in 1899 and a project proposed to include the ferry and a length of 24 miles(38km) of line.  
The branch was surveyed in 1899 and a project proposed to include the ferry and a length of 24 miles(38km) of line.  
<ref>[https://archive.org/stream/RailwayProjects/Railway%20projects#page/n0/mode/2up  "Histories of (Indian)Railway Projects ...up to June 1906"]; Retrieved 11 Dec 2015</ref>


There is no corroborating information to show that this railway was constructed
There is no corroborating information to show that this railway was constructed


==External Link==
== References ==
*[https://archive.org/stream/RailwayProjects/Railway%20projects#page/n0/mode/2up  Histories of (Indian)Railway Projects ...up to June 1906]
<references />


[[Category:Railway Surveys]]
[[Category:Railway Surveys]]
[[Category:Railways]]
[[Category:Railways]]

Revision as of 09:55, 11 December 2015

The Hajiganj-Shatnal Railway Survey was a branch line proposed in 1897 by Assam-Bengal Railway(ABR) to link Eastern Bengal Railway(EBR)’s existing line from Goalundo to Narayangaj with a wagon ferry to Shatnal and a line to Hajiganj.

The branch was surveyed in 1899 and a project proposed to include the ferry and a length of 24 miles(38km) of line. [1]

There is no corroborating information to show that this railway was constructed

References